Hourly Workforce Time Tracking & Scheduling3 min readUpdated September 2026

Scheduling Lab Techs and Field Sampling Crews Accurately

Life sciences consultancies need scheduling for shift-based lab work and time verification for field sampling crews. Lab work means monitoring an experiment or assay on a schedule that ignores business hours, while sampling crews collect data on-site, sometimes at a client's facility and sometimes in the field, so each group needs both for different reasons.

Buddy Punch and Deputy both fit pieces of this, and the right starting point usually depends on which of the two, lab shift coverage or field site verification, is the bigger operational headache right now.

Vendors Covered in this Article

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Why lab and field work don't fit a standard nine-to-five tool

A lab process that needs monitoring every few hours around the clock, or a field sampling schedule dictated by tide tables, weather windows, or a client facility's operating hours, doesn't map onto a standard Monday-through-Friday scheduling assumption. Tools built primarily around office hours can work here, but only if they're flexible enough to handle irregular shift patterns without a lot of manual workaround, and it's worth testing that flexibility directly before committing to either platform.

Deputy's fit: covering a lab process on a non-standard schedule

For lab work that needs monitoring at irregular intervals, an assay that has to be checked every six hours regardless of what day it is, Deputy's shift-based model can build that pattern directly rather than forcing it into a standard weekly rotation. Technicians can see upcoming coverage windows and swap into or out of a monitoring shift as needed, which matters when a technician can't make a two-in-the-morning check and someone else needs to cover it on short notice.

Buddy Punch's fit: verifying field sampling site visits

For a field sampling crew, Buddy Punch's GPS-tagged punches confirm a technician was actually at the sampling location when they say they were, which matters for a consultancy whose client deliverable depends on data collected at a specific place and time. If a client or regulator ever questions when and where a sample was actually taken, a verified punch record backs up the field log in a way a self-reported timesheet doesn't.

Keeping the pay differential straight for overnight lab shifts

Overnight or odd-hours lab monitoring shifts often carry a different pay rate than standard daytime lab work, and it's easy for that differential to get applied inconsistently if it's tracked manually. Configure shift types with the correct pay rate built in from the start, rather than relying on whoever runs payroll to remember which shifts qualify for the differential each pay period, since that's exactly the kind of manual step that quietly drifts over time.

What field crews need that a lab team doesn't

A field sampling crew has different practical needs than a lab-based team: unreliable cell signal at remote sites, travel time to and from a site that may or may not be paid depending on the firm's policy, and sometimes multiple sites visited in a single day. Decide and document the firm's policy on travel time explicitly, since this is a common source of confusion and underpayment if it's left to informal assumption rather than a written rule applied consistently.

A practical starting point if both problems exist at once

A consultancy running both lab and field operations doesn't have to solve both at once with a single tool on day one. Start with whichever team has had the more concrete problem, a client dispute over field hours points toward Buddy Punch first, a lab coverage gap points toward Deputy first, and expand from there once the initial rollout is working well rather than trying to stand up a perfect system for both teams simultaneously.

When both lab and field problems exist, work through them in this order:

  1. Identify which team has had the more concrete problem, rather than trying to solve both on day one with a single rollout.
  2. If a client has disputed field hours, start with Buddy Punch and its GPS-tagged, geofenced punches.
  3. If a lab coverage gap is the bigger problem, start with Deputy and its shift-based model for irregular intervals.
  4. Expand to the second team once the first rollout is working well, testing the specific shift pattern before going broad.

Documenting chain of custody alongside time records

For sampling work tied to regulatory submissions, the time and location record can become part of a broader chain-of-custody trail that a client or regulator might review long after the fact. Treat the punch record as a supporting document to the formal field log, not a replacement for it, and make sure whoever manages the sampling protocol knows the time-tracking data exists and can be pulled if a question comes up about when a specific sample was collected.

This kind of cross-referencing tends to get set up only after the first time it's needed under pressure. Setting the expectation early, that the two records should agree and both should be retained, saves a scramble later when a client or auditor specifically asks for documentation the firm assumed it already had in order and ready to hand over on short notice.

Executive Capability Standard

What Good Looks Like

Good workforce management for a life sciences consultancy means lab monitoring shifts are covered on whatever schedule the science actually requires, field sampling hours are verified against the site where work happened, and pay differentials and travel policies are applied consistently rather than left to memory.

Building The Capability (5-Stage Skill Ladder)

1. Learn:Map out the lab and field teams' actual scheduling patterns and note where they diverge from a standard business-hours assumption.
2. Do Manually:Have lab and field staff log hours and site visits on paper logs reviewed weekly by a lab or field manager.
3. Delegate:Put a lab manager and a field lead each in charge of building and adjusting their own team's coverage schedule.
4. Automate:Move lab coverage onto a shift tool like Deputy and field verification onto a geofenced tool like Buddy Punch.
5. Buy:Add configured pay differentials and a documented travel-time policy so both teams' pay is calculated consistently without manual review each period.

How to Get Started

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Frequently Asked Questions

Is travel time to a remote sampling site considered paid work time?

This depends on the specific circumstances and applicable state law, particularly whether the travel is the employee's normal commute or travel required during the workday between sites. It's worth confirming the firm's policy with employment counsel rather than assuming a blanket answer applies.

Can either tool handle a lab monitoring shift that isn't on a normal daily schedule?

Deputy's shift-based model is generally more flexible for irregular lab monitoring shifts than a tool built around standard daily punches. That includes a check required every six hours regardless of the day, but test the specific pattern directly before rolling it out broadly.

How do we verify a field technician was actually at the sampling site?

GPS-tagged, geofenced punches through a tool like Buddy Punch confirm location at the time of the punch, which is useful supporting documentation alongside whatever field log or chain-of-custody record the sampling protocol already requires.

About the numbers

This guide doesn't quote a sourced benchmark. Figures in it are estimates or general guidance, so check them against your own numbers.

Related Guides