Device Management & MDM Operations3 min readUpdated September 2026

Kandji vs Rippling IT for Life Sciences Consultants

Choosing between Kandji and Rippling IT for a life sciences consulting firm means weighing two things together: how well each protects unpublished research, early trial results and unpatented formulations on consultants' laptops, and how quickly access ends when a short-term subject-matter expert leaves. Kandji suits stable Mac teams; Rippling suits firms with frequent specialist engagements.

Vendors Covered in this Article

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Why this data is unusually unforgiving of a leak

Unlike a leaked strategy deck, which is embarrassing but recoverable, unpublished research data or an early formulation exposed before a patent filing can permanently affect a client's competitive position, since patent protection generally depends on the invention not having been publicly disclosed beforehand. That makes device-level protection, encryption, screen lock, and prompt wipe on departure, a genuinely higher-stakes decision here than in most consulting contexts covered elsewhere in this cluster, and one worth budgeting real attention to rather than treating as a routine IT checkbox.

Kandji's case for a consulting team on Macs

If your consultants and subject-matter experts work primarily on Macs, Kandji's pre-built compliance baselines and fast enrollment give you a demonstrable way to show that every laptop touching client research meets a defensible standard, which matters when a client's own legal or compliance team asks how their data is protected before an engagement even starts. Its zero-touch setup also helps when bringing on a specialist for a short, focused engagement where time matters, since there isn't always a week to spare configuring a laptop before the work needs to begin.

Rippling's case for firms with frequent specialist engagements

Consulting firms in this space often bring in a specific subject-matter expert for one engagement and release them once it closes, similar to other project-based consulting industries in this cluster. Rippling's tie between device access and the same staffing record used for payroll means that expert's access to a client's research data can be revoked the same place their engagement ends, rather than depending on a manual handoff during a busy transition to the next project, which is when this kind of detail is easiest to lose track of.

What device policy can't do for pre-publication data

Encryption protects a laptop if it's lost; it doesn't stop a departing consultant from having synced client research to a personal cloud account before their access was revoked, or from discussing unpublished results in a context the client hasn't approved. Those risks need their own controls, a firm-managed file-sharing system rather than personal accounts, and clear engagement terms about what a consultant can and cannot retain after a project ends, reviewed with the client directly when the sensitivity warrants it.

A mistake that surfaces when a specialist works with several clients

A consultant working across several biotech clients at once, a common pattern for specialized expertise in this field, is at real risk of one client's research crossing into another's project folder if the laptop and file structure aren't kept genuinely separated by engagement. This isn't primarily a device-management problem, it's a file-organization discipline that a well-run device policy should reinforce, not solve on its own; build the separation into how the laptop is actually used, not just how it's encrypted, and check it periodically rather than assuming it holds on its own over time.

Weighing the two for your firm's engagement pattern

A firm with a small, stable Mac-based consulting staff can reach a demonstrable data protection baseline quickly through Kandji. A firm that brings in specialists for short, focused engagements frequently, already tracked through Rippling for contractor payments, gets more recurring value from keeping device access tied to that same engagement record automatically rather than managing it by hand each time.

Setting expectations with the client before the engagement starts

The clearest way to avoid a dispute later is to state, in writing, before an engagement begins, exactly what device and data-handling standard the consultant will meet: encryption, no personal cloud storage of client materials, and a defined process for returning or destroying data once the engagement closes. Clients in this space are used to being asked this and generally appreciate a firm that raises it proactively rather than waiting to be asked, since it signals the firm has actually thought through how sensitive their work really is going to be.

Before an engagement starts, put these device and data-handling terms in writing for the client:

  • Every laptop that touches client research is encrypted and locked with a screen lock, so a lost device does not expose unpublished data.
  • Client materials stay in a firm-managed file-sharing system, and no one syncs them to a personal cloud account.
  • Each client's files sit in a separate engagement folder, so one client's research never lands in another client's project.
  • Access to shared drives and research repositories is revoked the same day the engagement ends, not only when the laptop is wiped.
  • A defined process covers returning or destroying client data once the engagement closes.
Executive Capability Standard

What Good Looks Like

Every consultant's laptop is encrypted and enrolled before they access a client's research data, and access to that data is fully revoked the same day their engagement on that specific project ends.

Building The Capability (5-Stage Skill Ladder)

1. Learn:List which consultants currently hold access to which clients' research data, and confirm each laptop's encryption status directly.
2. Do Manually:Walk through engagement-based access revocation by hand at the close of each project, checked against a written list of what that consultant had access to.
3. Delegate:Assign one operations lead to own device enrollment and engagement-based access changes across every active and closing project.
4. Automate:Deploy Kandji or Rippling so device enrollment, encryption, and patch deadlines apply themselves as specialists are brought onto new engagements.
5. Buy:Pair device management with a firm-managed, engagement-scoped file-sharing system, so client research never has to live in a consultant's personal cloud storage.

How to Get Started

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Frequently Asked Questions

Can a leaked laptop affect a client's patent filing?

Potentially, since patent protection generally depends on an invention not being publicly disclosed before filing, and a leak involving unpublished research could complicate that. This is a legal question specific to the client's situation, so a consultant handling this kind of data should confirm expectations with the client's counsel rather than assume.

How should a consulting firm keep multiple biotech clients' data separated on one consultant's laptop?

Use a clear, engagement-based folder structure and a firm-managed file-sharing system rather than personal cloud storage, and train consultants to treat each client's materials as fully separate. Device encryption protects the laptop overall, but it doesn't enforce separation between two clients' folders on the same machine.

Should a departing specialist's access to client research be revoked immediately?

Yes, the same day their engagement ends, including revoking access to any shared drives or research repositories, not just wiping their laptop. Unpublished research sitting accessible to someone no longer engaged on the project is exactly the kind of exposure this industry can least afford.

About the numbers

This guide doesn't quote a sourced benchmark. Figures in it are estimates or general guidance, so check them against your own numbers.

Related Guides