Workflow Automation & Integration3 min readUpdated September 2026

Make vs Zapier for Life Sciences Consultants Handling Data

A life sciences or biotech consulting firm runs two kinds of work that rarely fit the same automation template: fast-moving proposal and project setup, and slow, deadline-driven regulatory submission tracking where a missed date has consequences well beyond the firm's own schedule.

Zapier and Make both connect a firm's CRM, project tools and document systems, but the sensitivity of the data involved, often a client's unpublished research or regulatory strategy, changes how carefully either tool should be used here compared with a lower-stakes business.

Vendors Covered in this Article

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Turning a scoped proposal into a project without losing technical detail

A signed proposal for a life sciences engagement usually carries technical scope detail, specific study types, regulatory pathways, deliverable formats, that a generic project template won't capture if the automation just pulls basic deal fields. Make's ability to parse a structured proposal document and populate project fields based on the specific service line involved is a better fit than a flat template applied regardless of engagement type.

Where either tool falls short is inferring scope from unstructured text. Keep your proposal template structured enough, with clearly tagged fields for engagement type and key deliverables, that whichever tool you use can reliably pull from it rather than guessing at meaning from a paragraph of prose.

Tracking a regulatory submission deadline that doesn't move for anyone

Some regulatory submission deadlines, especially those tied to an agency's own review clock, are hard to move, and missing one can cost a client months of delay on a product timeline. A tracking automation that flags an approaching deadline with escalating urgency as the date nears, rather than a single reminder easily missed in a busy inbox, matches the stakes involved.

Make's ability to escalate through multiple channels, and multiple people, as a deadline gets closer is a more defensible version of this than a single Zapier reminder. For a deadline this consequential, redundancy in how the reminder reaches the team is worth the extra setup time.

A deadline reminder scheme built for an immovable date includes the following:

  • Send the first reminder well ahead of the submission date, early enough that the team can still resolve open questions.
  • Raise the urgency of each reminder as the date nears, instead of repeating the same message.
  • Add more than one channel as the deadline approaches, so a single missed inbox cannot hide it.
  • Name the specialist responsible for the submission in every reminder so ownership is never ambiguous.

Handling client data that shouldn't touch a general-purpose tool casually

Much of what a life sciences consulting firm handles is unpublished research data or regulatory strategy that a client would consider highly sensitive, and routing that kind of data through an automation platform needs the same scrutiny you'd apply to any other system touching it. Confirm with your client's own data handling requirements, and your firm's confidentiality obligations, before an automation moves sensitive project data between systems, rather than assuming a convenient connection is automatically fine to build.

Scope any automation touching this kind of data as narrowly as possible: the specific fields it needs, not broad access to a whole project folder, and document what each automation touches so that documentation is ready if a client or an auditor ever asks.

Coordinating a multi-disciplinary project team without version confusion

A single engagement often pulls in regulatory, clinical, and technical specialists working from a shared but evolving set of project documents, and keeping everyone aligned on the current version matters as much here as it does on a construction project, if not more, given the consequences of a wrong document reaching a regulatory submission.

An automated distribution tied to document version events, with the current project team pulled fresh at send time rather than a static list, keeps this accurate as team composition shifts phase to phase. Either tool can manage this for a small team; Make's handling of a longer, more varied distribution list scales better as project teams grow.

Where automation stops and specialist scientific judgment starts

Time-to-fill for specialized technical roles has been stretching across the industry1, and that pressure makes it tempting to let automation quietly absorb more than it should. Resist letting any automation summarize, interpret or draft actual scientific or regulatory content, that judgment has to come from the qualified specialists on the engagement, with automation limited to moving information and enforcing deadlines around them.

This boundary matters more here than in most businesses in this comparison, given how directly the work connects to product safety and regulatory approval. When in doubt about whether a step needs specialist review, treat that as the default rather than the exception.

Revisit that boundary explicitly whenever a new team member joins a project, rather than assuming it carries over from firm culture alone. A specialist new to the firm, or a junior staff member eager to be helpful, is exactly who's most likely to quietly let an automation draft something it shouldn't, simply because nobody told them clearly where the line actually sits on this particular engagement.

Executive Capability Standard

What Good Looks Like

Good firm automation captures true engagement scope from a signed proposal, tracks a regulatory deadline with escalating redundancy as it approaches, and never lets sensitive client research data move through a connection broader than it needs to be.

Building The Capability (5-Stage Skill Ladder)

1. Learn:Learn your firm's actual data sensitivity classifications and each client's specific handling requirements before connecting any automation to project data.
2. Do Manually:Track proposals and regulatory deadlines by hand for a stretch, so you understand the real escalation points before encoding them into automation.
3. Delegate:Hand routine project setup and deadline tracking to an operations coordinator, with a documented, compliance-reviewed checklist for what each engagement type requires.
4. Automate:Build the proposal-to-project and deadline-escalation flows in Make or Zapier, scoped narrowly around specific fields rather than broad data access.
5. Buy:For core regulatory submission tracking and document control, consider a validated life sciences project management platform built for that specific regulatory context.

How to Get Started

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Frequently Asked Questions

Can Make or Zapier draft a regulatory submission section for us?

No, and this is one of the clearest lines in this comparison. These tools can track the deadline and route documents to the right specialists, but the actual regulatory content has to come from qualified staff reviewing the specific study data and regulatory pathway involved.

Is it safe to connect our automation tool directly to a client's raw research data?

Only after confirming it against your client's own data handling requirements and your firm's confidentiality obligations, since this varies by client and by the sensitivity of the specific data involved. Scope any connection narrowly to the specific fields needed, rather than broad folder-level access.

How much advance warning should a regulatory deadline reminder give?

Build in escalating reminders well ahead of the date, not a single notice close to the deadline, and escalate through more than one channel as the date approaches. Given how immovable these deadlines usually are, redundancy in how the reminder reaches the team is worth the extra setup time.

Sources

Where we quote a benchmark, we show its source. Other figures in this guide are estimates or general guidance, so check them against your own numbers.

  1. Median time-to-fill, requisition open to offer accepted (SHRM 2025). SHRM 2025 Recruiting Executives Benchmarking data brief (PDF), 2025.

Related Guides