Remote IT Asset Management & Hardware Lifecycle3 min readUpdated September 2026

Rippling vs Firstbase for a Design Studio's Rendering Workstations

An architecture studio's BIM and rendering software genuinely needs serious hardware, enough graphics power to spin a 3D model in real time during a client meeting without it stuttering. That requirement changes the equipment math compared with most other professional services firms in this comparison, and it's worth understanding before deciding which platform's approach to procurement actually fits a design studio's needs.

Vendors Covered in this Article

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Why Architecture Firms Can't Default to a Standard Laptop Tier

A basic business laptop can run email and spreadsheets fine but will struggle badly with BIM modeling software or high-resolution rendering, which makes the "one standard laptop for everyone" approach that works for many professional services firms a poor fit here. Design staff need workstations with real graphics capability, and that's a materially different, and more expensive, equipment decision than what a bookkeeper or an account manager needs.

Getting this wrong in either direction is costly: underspecced hardware slows down every design review, while overspending on the most capable workstations for administrative staff who never touch the modeling software burns budget without any real benefit.

Rippling's Case: A Studio With a Stable Design Team

For a studio's core design staff and project architects, people employed year-round who move between projects as part of their normal workload, Rippling's combined HR and device provisioning means a new hire's workstation order and their benefits enrollment happen from the same trigger.

It's a weaker fit for the sub-consultants architecture firms frequently bring in for a single project, structural or MEP engineers, renderers, or landscape architects who aren't on the firm's own payroll and only need system access for the length of that project.

Firstbase's Case: Project-Based Sub-Consultants and Renderers

Firstbase fits the project-based side of architecture practice, provisioning a device to an outside renderer or sub-consultant for the length of a specific project and reclaiming it once that project's deliverables are finished, without the studio having to manage that relationship through its own payroll system.

For a studio billing device costs back against a specific project, it's worth knowing that engineering and construction-adjacent firms run accounts payable around 36 days on average1, since that's a reasonable reference point for how a device lease term should track a project's own billing cycle.

What Happens to Client Renderings When a Project Wraps

When a project closes out, the workstation used for it typically needs to be repurposed for the next project rather than sitting idle, but that repurposing has to happen without losing the client's design files or leaving a prior client's renderings accessible to whoever inherits the machine.

A clean handoff means the prior project's files are moved to the studio's archive, the local cache is cleared, and the new project's file structure is set up before the workstation is reassigned, not left for the next person to discover a folder full of someone else's client work.

A clean handoff between projects covers these steps:

  1. Archive the finished project's design files so the client's work is safe before anyone touches the workstation.
  2. Clear the prior client's renderings and files from the machine so whoever inherits it cannot open them.
  3. Confirm the wipe is complete before the workstation is repurposed for the next project.
  4. Hand the cleaned workstation to the next project team with graphics capability intact, rather than leaving it idle.

Pitfalls When Sub-Consultants Bring Their Own Hardware

Letting a sub-consultant use their own laptop to access the studio's shared model files is a common shortcut that saves a procurement step and creates a harder-to-see problem: the studio has no way to confirm that laptop is encrypted, no way to remotely wipe it if it's lost, and often no clean way to confirm the sub-consultant's local copy of the model was actually deleted once the project ended.

A firm-issued, encrypted device for anyone touching the studio's live project files, sub-consultant or not, closes that gap and gives the studio something concrete to point to if a client asks how their design files were protected during the project.

Setting a Workstation Refresh Cycle That Matches the Software

BIM and rendering software tends to demand more from hardware with each major release, which means a workstation refresh cycle set purely on age, replace every four years regardless, often leaves design staff working on hardware that's technically fine but genuinely too slow for the current software version well before the replacement date arrives.

Tying the refresh decision to whether the current hardware still runs the studio's core software smoothly, checked against each major software update, is a better signal than a flat calendar date, even if it means some workstations get replaced sooner than a standard cycle would suggest.

Deciding Whether Renderers Work On-Site or Remotely

Some studios keep renderers and visualization specialists in-house, others rely entirely on remote freelancers who only need secure access to the model files rather than a full workstation shipped to them. That distinction changes the equipment decision: an in-house renderer needs the same graphics-capable machine as design staff, while a remote specialist working through a secure remote desktop connection to the studio's own workstation may need almost no local hardware at all.

Checking which model actually fits before defaulting to shipping a full workstation to every remote contributor can meaningfully cut both cost and the number of devices the studio has to track and reclaim.

Executive Capability Standard

What Good Looks Like

An architecture studio has this under control when design and administrative staff are on separate, role-matched equipment tiers, when sub-consultants use firm-issued encrypted devices for live project files, and when workstation refresh decisions are tied to actual software performance rather than a flat age cutoff.

Building The Capability (5-Stage Skill Ladder)

1. Learn:Check whether your current workstation assignments actually match design versus administrative roles, or whether they were set by hire date instead.
2. Do Manually:Write a policy requiring firm-issued, encrypted devices for anyone, staff or sub-consultant, who accesses live project model files.
3. Delegate:Assign one person to own workstation refresh decisions based on software performance, rather than leaving it to individual project leads to request upgrades.
4. Automate:Tie device reclaim and file archiving to project close-out in your project management system, so workstations get cleaned and repurposed on schedule.
5. Buy:Use Rippling for your core design staff and Firstbase for project-based sub-consultants and renderers who need equipment for the length of one project.

How to Get Started

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Frequently Asked Questions

Do architecture studios need different laptops for design staff versus administrative staff?

Yes. Design staff running BIM and rendering software need real graphics capability that administrative staff generally don't, so defaulting everyone to the same standard laptop tier either slows down design work or overspends on hardware that goes unused. Setting separate equipment tiers by role avoids both problems.

Should sub-consultants use their own laptops to access project files?

It's a real risk, since the studio can't confirm a personal device is encrypted or remotely wipe it if it's lost, and can't easily verify local project files were deleted after the engagement ends. A firm-issued, encrypted device for anyone touching live project files closes that gap.

How often should design workstations be replaced?

Rather than a flat calendar cycle, tie replacement to whether the current hardware still runs your core BIM or rendering software smoothly after each major update. This keeps design staff on hardware that actually performs, instead of technically-current machines that have quietly become a bottleneck.

Sources

Where we quote a benchmark, we show its source. Other figures in this guide are estimates or general guidance, so check them against your own numbers.

  1. Payables days (AP/Sales x 365) by industry (US). NYU Stern (Aswath Damodaran), Working Capital Ratios by Industry, US, 2026.

Related Guides