Asana vs Monday.com for Civil and Structural Engineering Firms
A structural or civil engineering project moves through defined phases, schematic design, design development, construction documents, and then construction administration, each with its own deliverable set and its own back-and-forth with architects and other consultants on the team. Once drawings are stamped and construction starts, the work shifts almost entirely to RFIs and submittal reviews with hard response windows.
Here's a worksheet you could build in either tool to track that phase-by-phase deliverable and submittal flow, and where the two differ in practice.
Vendors Covered in this Article
Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.
Building a phase tracker that mirrors your contract
Start with a board or project structured around the actual phases in your contract, not a generic project template: schematic design, design development, construction documents, bidding, and construction administration, each as its own section or status group. Monday.com's status columns can show, at a glance, which phase every active project sits in, useful for a principal scanning a dozen jobs before a Monday morning meeting. Asana's sections within a project do the same, with the added benefit of task dependencies enforcing that construction documents genuinely can't start until design development deliverables are marked approved by the client, which matches how these phases actually gate each other in practice.
Logging submittals and RFIs during construction administration
Once construction starts, the volume of discrete items shifts entirely to submittals needing review and RFIs needing an answer, both with contractual response windows that matter. Neither Asana nor Monday.com is a dedicated construction submittal log, so the practical approach is a dedicated board or project just for this phase, with a custom field for submittal number, a due date calculated from your response window, and a status showing reviewed, approved, or returned with comments. Monday.com's number and date columns make the response-window math visible in the same row as the item; Asana's custom fields do the same with a rule that flags anything approaching its due date, useful when a firm is juggling dozens of open submittals across several active construction projects at once.
Coordinating with architects and other disciplines
An engineering firm rarely works alone, coordination with the architect of record and often MEP or other consultants is constant, and a coordination comment buried in an email thread is how conflicting design decisions slip through unnoticed. Both tools can host a shared coordination board that external consultant guests access for cross-discipline items specifically, distinct from your firm's internal task management, so a structural clash gets flagged and resolved with a visible record rather than getting lost between separate firms' inboxes.
Who actually owns the PE stamp and sign-off
A licensed engineer has to review and stamp deliverables before they go out, and that review step deserves its own explicit status, not just done, since a stamped deliverable carries professional liability the internal draft doesn't. Build a required review-and-stamp status that only the licensed engineer of record can move a deliverable through, with the actual review recorded as a comment or attachment on the task. This is a workflow discipline more than a feature difference between the two tools, but it's worth building deliberately rather than assuming everyone remembers who needs to sign off before something goes out the door.
What a project's staffing continuity is worth
Engineering staff tend to stay with a firm for a while once licensed and established; broader workforce tenure data runs around 46.8 months1, long enough that a poorly documented project structure becomes a real handoff cost when an engineer moves to a new role internally partway through a multi-year project. Building a consistent phase-tracker template across every project, rather than letting each project manager improvise their own structure, is what keeps that kind of internal transition from costing the client a slowdown they never should have noticed.
Bringing on a new client and setting expectations early
Landing a new client for structural or civil work involves its own timeline, an initial scoping conversation, a fee proposal, and often a competitive selection process before a contract is signed. That pursuit can take a while: a new client relationship averages around 91 days from first conversation to signed agreement across B2B services generally2, which is worth setting realistic internal expectations around when a business development partner is chasing a promising lead. Once signed, feeding that new project directly into your standard phase-tracker template, rather than starting a blank board while momentum from the win is still fresh, keeps the kickoff from losing time to internal setup.
A mistake worth avoiding on the submittal log specifically
The most common mistake firms make with a submittal log isn't choosing the wrong tool, it's letting the log lag a day or two behind reality because updating it feels like overhead compared with the actual engineering review work. A log that's out of date is worse than no log at all, since a project manager checking it gets false confidence that everything's on track. Build updating the log into the actual review workflow itself, the status changes the moment a reviewer opens the item, not as a separate administrative task someone does at the end of the week when the accumulated backlog makes it tedious enough to skip.
Keep the submittal log trustworthy with these habits:
- Update the log the same day a submittal or RFI arrives or gets answered, so it never lags a day or two behind reality.
- Record each item's contractual response window as a due date, so the review clock is visible to everyone on the project.
- Give licensed review and the PE stamp their own required status, separate from a generic done, and restrict who can move a task through it.
- Structure the tracker around the phases in your contract rather than a generic project template.
- Keep external consultants on a separate coordination board scoped to cross-discipline items, not your internal project board.
What Good Looks Like
A well-run engineering practice can show, for any active project, exactly which phase it's in, which submittals or RFIs are open against their response window, and whether a PE review is still pending, without a project manager reconstructing it from memory.
Building The Capability (5-Stage Skill Ladder)
How to Get Started
Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.
Phase-based sections with real dependencies enforce that construction documents can't start before design development is actually approved.
Number and date columns make submittal response-window math visible in the same row as the item, useful when juggling many open submittals at once.
Custom fields for submittal number, discipline, and response window can be combined into one workspace view spanning several active construction projects.
Frequently Asked Questions
Can either tool replace a dedicated construction submittal log?
Not fully. Both can approximate one with custom fields for submittal number, due date, and review status, workable for a small to mid-sized firm's volume. A firm managing very high submittal volume across many concurrent construction projects may eventually want dedicated construction administration software that handles response-window math and formal logs more natively.
How do we make sure a PE stamp review never gets skipped?
Build a required status specifically for licensed review and sign-off that sits before a deliverable can move to sent or approved, and restrict who can move a task through that status to your licensed engineers of record. Neither tool enforces professional licensure requirements on its own; the workflow has to make skipping that step visibly abnormal.
Should external consultants get access to our internal project board?
No, keep a separate coordination board scoped to cross-discipline items for external consultant guests, distinct from your firm's internal task management. This keeps coordination visible and centralized without exposing your firm's internal notes, staffing decisions, or unrelated project detail to outside parties.
Sources
Where we quote a benchmark, we show its source. Other figures in this guide are estimates or general guidance, so check them against your own numbers.
- Median tenure with current employer (converted to months). BLS Employee Tenure in 2024 (CPS supplement, January 2024), 2024.
- Average B2B sales cycle length. Ebsta x Pavilion 2025 GTM Benchmarks Report, 2025.
Related Guides
Justworks vs Rippling for a Civil Engineering Firm's Field Staff
A checklist for civil and structural engineering firms weighing Justworks against Rippling, covering licensed staff, field work, and multi-state projects.
Kandji vs Rippling IT for Civil Engineers in the Field
Civil and structural engineering firms split time between office workstations and job sites. How Kandji and Rippling handle that mixed device reality.
Make vs Zapier for Civil Engineering Firms Tracking RFIs
Compare Make and Zapier for a civil or structural engineering firm managing RFIs, submittal reviews and phase-based project billing across active jobs.
Rippling vs Firstbase for Engineers Splitting Time Between Office and Site
For civil and structural engineering firms: comparing Rippling and Firstbase when staff need both CAD workstations and rugged field laptops.
A Runbook for Documenting a Structural Firm's QA/QC
A step-by-step runbook for civil and structural engineering firms choosing between Notion and Slite to document QA/QC procedures and calc standards.
Deel vs Remote for Civil Engineering Firms: Hiring Abroad
A decision guide for civil and structural engineering firms choosing Deel or Remote for CAD, drafting, and junior engineering hires outside the US.