Make vs Zapier for Civil Engineering Firms Tracking RFIs
A civil or structural engineering firm's project workflow runs on a steady stream of RFIs and submittals, each with its own deadline and its own consequence for the project schedule if it sits too long. Layer in phase-based billing tied to project milestones, and a firm running several active jobs at once has a real coordination problem hiding behind what looks like routine paperwork.
Zapier and Make both connect a firm's project management tool, document system and invoicing software, but the volume and deadline-sensitivity of RFI and submittal tracking is where the two tools start to separate.
Vendors Covered in this Article
Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.
How Do You Route an RFI to the Right Engineer Without Manual Triage?
An incoming RFI needs to reach the engineer who actually owns that discipline or project area, not sit in a shared inbox until someone happens to open it. A basic rule, route by project, works fine in either tool for a firm with one engineer per active project.
Most firms aren't that simple. An RFI touching structural and civil scope on the same project needs to reach both, and one touching only a drainage detail needs to reach just the civil engineer assigned to that piece. Make's router can evaluate an RFI's tagged discipline against a project's assigned team and route to the right subset of people, which a chain of Zapier filters can approximate but becomes harder to maintain as project team structures vary.
Keeping a submittal deadline from slipping past a project's critical path
A submittal review that sits too long can push back a contractor's procurement timeline, and on a project with a tight schedule that delay compounds fast. A scheduled check that flags any submittal approaching its review deadline, escalating to a project manager if it's not moving, catches this before it becomes a schedule problem the client notices.
This works reasonably in either tool for a single project. Rolling that check up across every active project into one internal view of at-risk submittals, so a principal can see firm-wide bottlenecks rather than checking each project separately, is where Make's ability to aggregate across multiple projects in one scenario earns its complexity.
How Do You Bill a Project Phase Once It Is Approved?
Phase-based billing, schematic design, design development, construction documents, construction administration, ties an invoice to a milestone that a client or a project manager has to formally approve, not just a task getting marked done in your PM tool. Wiring the invoice trigger to the approval event, rather than to a task status that might not reflect that approval, matters for cash flow that depends on getting phase invoices out promptly.
Make's ability to check that every deliverable under a phase is both complete and approved, not just complete, before firing the invoice is a more accurate version of this than a Zapier flow triggered on a single task's status.
Tie phase billing to real approval with these rules:
- Tie the invoice trigger to an explicit approval event, not to a task status that may only mean internal completion.
- Have a client or project manager formally approve each phase, such as schematic design or construction documents, before an invoice can fire.
- Confirm that a task status genuinely reflects approval before you use it as a trigger for anything.
- Avoid invoicing unapproved work, which creates an awkward conversation with the client.
Coordinating with contractors and other consultants without duplicate notifications
A typical project involves your firm alongside an architect, other engineering disciplines and a contractor, and a document revision often needs to reach several of those parties at once without flooding anyone's inbox with duplicate copies of the same notification routed through different channels.
Build a single notification point per document event, with the recipient list pulled from the project's actual team roster rather than a static distribution list that goes stale as team members change project to project. Either tool can do this, but Make's ability to check who's currently assigned before sending, rather than trusting a list built once at project kickoff, keeps notifications accurate over a project's full lifespan.
Knowing where automation stops and licensed engineering judgment starts
Time-to-fill for technical roles has been running long across the industry1, which makes it tempting to lean on automation to cover gaps left by a stretched team. Resist letting that automation drift into anything resembling engineering judgment, an RFI response, a design decision, a stamped calculation, which has to come from a licensed engineer regardless of how much of the surrounding paperwork is automated.
The clearest line: automation should move information and enforce deadlines, never generate or approve the engineering content itself. A firm that keeps that boundary explicit avoids the slow drift where a convenient shortcut in a busy week becomes an unreviewed habit months later.
Put this in writing as a short internal policy rather than leaving it as an assumption everyone's expected to share. Name exactly which automated actions are fine to run unattended, routing, reminders, document distribution, and which always require a licensed engineer's direct review, so a new hire or a contract drafter joining a busy project has a clear line to follow instead of guessing where it sits.
What Good Looks Like
Good firm automation routes an RFI to the right discipline immediately, flags a slipping submittal deadline before it hits a project's critical path, and bills each phase only once it's genuinely approved.
Building The Capability (5-Stage Skill Ladder)
How to Get Started
Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.
Zapier works for a smaller firm running few concurrent projects, where RFI routing is straightforward and doesn't need to weigh discipline against team assignment.
Make fits once you're running enough concurrent projects that rolling up at-risk submittals firm-wide, or routing by discipline and team, needs real logic rather than one static rule.
Workato is worth evaluating for a larger multi-office firm needing centralized governance across many project systems and disciplines at once.
Frequently Asked Questions
Can Make or Zapier draft an RFI response for us?
No, and you shouldn't want it to. These tools can route the RFI to the right engineer and track the deadline, but the actual technical response has to come from a licensed engineer reviewing the specific project conditions, not a template or an automated summary.
How do we avoid a submittal review deadline slipping on a busy project?
Set up an escalation rule that flags any submittal nearing its deadline without movement and routes the flag to a project manager as well as the reviewer. That gives a second set of eyes on anything left unattended while the reviewing engineer is swamped, so a delay is caught before it reaches the critical path.
Should phase billing trigger automatically when a task is marked complete?
Only if that task status genuinely reflects client or project approval, not just internal completion. Tie the invoice trigger to an explicit approval step rather than a task checkbox, since those two things can diverge and an invoice sent on unapproved work creates an awkward conversation with the client.
Sources
Where we quote a benchmark, we show its source. Other figures in this guide are estimates or general guidance, so check them against your own numbers.
- Median time-to-fill, requisition open to offer accepted (SHRM 2025). SHRM 2025 Recruiting Executives Benchmarking data brief (PDF), 2025.
Related Guides
Justworks vs Rippling for a Civil Engineering Firm's Field Staff
A checklist for civil and structural engineering firms weighing Justworks against Rippling, covering licensed staff, field work, and multi-state projects.
Kandji vs Rippling IT for Civil Engineers in the Field
Civil and structural engineering firms split time between office workstations and job sites. How Kandji and Rippling handle that mixed device reality.
Zendesk vs Intercom for a Civil Engineering Firm's RFI Log
Compare how Zendesk and Intercom handle RFIs, submittal reviews, and contractor correspondence for civil and structural engineering firms.
Deel vs Remote for Civil Engineering Firms: Hiring Abroad
A decision guide for civil and structural engineering firms choosing Deel or Remote for CAD, drafting, and junior engineering hires outside the US.
Pylon vs Plain for Structural and Civil Engineering Firms
Civil and structural engineering firms run projects through submittals and RFIs, not chat, most of the time. Here is when Pylon or Plain actually applies.
Site Inspections Don't Make an Engineering Firm a Trade
Civil and structural engineering firms do send people to sites, but stamped drawings and liability change everything else. Here's the real comparison.