Remote IT Asset Management & Hardware Lifecycle3 min readUpdated September 2026

Rippling vs Firstbase When a Document Review Team Exists for One Case

A document review team can assemble for a single matter, work eighty-hour weeks for six months, and dissolve the day the case settles, and every laptop that team used needs to be traceable and wipeable the moment the matter closes. That matter-based rhythm, more than headcount, is what a law firm's equipment process actually has to handle, and Rippling and Firstbase are built for different halves of it.

Vendors Covered in this Article

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

A Document Review Team That Exists for One Case

Contract reviewers hired specifically for a large litigation or investigation matter aren't associates on a career track at the firm, they're brought on for the length of that matter and released when it's done, sometimes within weeks. Treating their equipment the same way you'd treat a new associate's, ordered once and kept for years, misses the actual lifecycle: these laptops need to be provisioned fast, scoped tightly to that one matter's documents, and reclaimed the moment the matter closes.

A firm that hasn't separated "associate onboarding" from "matter staffing" in its own process usually finds out the gap exists when a reviewer's laptop is still active weeks after the case settled.

Where Rippling Fits: Associates and Staff on Long-Term Payroll

For associates, paralegals and staff who are employed by the firm year-round and rotate between matters as part of their normal caseload, Rippling's tie between HR, payroll and device enrollment works well, since a new matter assignment is an access-group change on an existing employee, not a new onboarding.

It's a weaker fit for contract reviewers hired through a legal staffing agency or as short-term 1099 contractors for a single matter, because those relationships typically sit outside a payroll-based platform's normal onboarding path.

Where Firstbase Fits: Contract Reviewers Hired for a Single Matter

Firstbase handles the pattern contract review staffing actually creates: get a laptop to someone who isn't a firm employee, scope it to one matter's document set, and reliably get it back when the engagement ends, whether that's in six weeks or six months. Its reclaim tracking matters more here than almost anywhere else, since an unreturned laptop from a departed contract reviewer is also an unaccounted-for copy of privileged documents.

Firms in the business and consumer services category run accounts payable close to 24 days on average1, which is worth knowing if you're billing device costs back to a client matter and need the lease term to line up with how quickly that matter's invoices get paid.

The Privilege Problem: What Has to Happen When a Matter Closes

The moment a matter closes or settles, every laptop that touched its documents needs its local cache of privileged material securely wiped, not just deleted, and every reviewer's access to the matter's document review platform needs to be cut the same day. A laptop that sits in a drawer for a month after a matter closes, still holding a local copy of work product, is a real exposure if it's lost or repurposed before that wipe happens.

What counts as an adequate wipe, and what your ethical obligations are around safeguarding client data on a departed contractor's device, depends on your jurisdiction's bar rules, so confirm the specific standard with your general counsel or ethics counsel rather than assuming a standard factory reset covers it.

Common Mistakes Firms Make With Contract Attorney Equipment

The most common mistake is letting a contract reviewer use a personal laptop on a matter's document review platform because provisioning a firm device felt slower than the case's start date allowed. That trades a hardware delay for a much larger problem: privileged documents cached on a device the firm doesn't control and can't remotely wipe when the engagement ends.

The second common mistake is treating reclaim as optional once the matter's billing closes, on the theory that the case is over so it doesn't matter anymore. It matters more at that exact point, because that's when nobody is actively watching what happens to the documents still on that laptop.

Setting a Matter-Close Checklist That Actually Gets Followed

Tie the return and wipe of every device used on a matter to the matter's formal close date in your practice management system, the same way you'd track final billing, and name a specific person, usually IT or the assigned paralegal, who confirms the wipe happened before the matter file is archived. A reasonable target is device collection within two weeks of matter close and a confirmed, documented wipe within a week after that.

Without that written trigger, matter close becomes a moment nobody owns, and the laptop question quietly falls through the same gap that swallows most contract staffing loose ends.

A matter-close checklist should cover these points:

  • Tie the return and wipe of every device used on a matter to the matter's formal close date in your practice management system.
  • Name one specific person, usually IT or the assigned paralegal, who confirms each wipe happened before the matter file is archived.
  • Cut every reviewer's access to the document review platform on the same day the matter closes, not weeks later.
  • Securely wipe the local cache of privileged material on each laptop rather than simply deleting files from the visible file system.
Executive Capability Standard

What Good Looks Like

A law firm has this under control when a contract reviewer's laptop is encrypted, scoped to one matter's document set, and returned with a documented wipe within a couple of weeks of that matter's formal close, every time, not just when someone remembers to ask for it back.

Building The Capability (5-Stage Skill Ladder)

1. Learn:Pull your last three closed matters that used contract reviewers and check how long it actually took to collect and wipe each laptop after close.
2. Do Manually:Write a matter-close checklist that names who collects devices, confirms the wipe and revokes document platform access, tied to the same date as final billing.
3. Delegate:Assign one person, usually IT or a paralegal on the matter, to own device reclaim so it doesn't depend on a departed contractor remembering to ship something back.
4. Automate:Tie access revocation on the document review platform to the matter's formal close date in your practice management system so it happens the same day, not whenever someone notices.
5. Buy:Use Rippling for associates and staff on firm payroll, or Firstbase for contract reviewers staffed onto a single matter outside a payroll relationship.

How to Get Started

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Frequently Asked Questions

Should contract document reviewers use their own laptops?

It's a real risk if the matter involves privileged material, since a personal device the firm doesn't control can't be remotely wiped when the engagement ends. A firm-issued, encrypted laptop scoped to that matter's document review platform gives you a clean chain of custody and a device you can reliably reclaim.

How quickly should a laptop be wiped after a matter closes?

A reasonable target is collection within two weeks of the matter's formal close and a confirmed wipe within a week after that, tied to the same close date used for final billing. What counts as an adequate wipe for privileged material depends on your bar's ethics rules, so confirm the standard with your general counsel.

Is Rippling or Firstbase better for a firm that uses contract reviewers regularly?

Firstbase generally fits better for contract reviewers hired outside your payroll for a single matter, since its procurement and reclaim process is built for exactly that short engagement pattern. Rippling works well for associates and staff on the firm's own payroll who rotate between matters as part of their normal caseload.

Sources

Where we quote a benchmark, we show its source. Other figures in this guide are estimates or general guidance, so check them against your own numbers.

  1. Payables days (AP/Sales x 365) by industry (US). NYU Stern (Aswath Damodaran), Working Capital Ratios by Industry, US, 2026.

Related Guides