Remote IT Asset Management & Hardware Lifecycle3 min readUpdated September 2026

Rippling vs Firstbase for MSSPs and Full-Disk Encryption

For an MSSP, Rippling is easier when you need one audit trail of who holds which device and which security policies applied, and Firstbase is easier when analysts are spread across regions. Neither enforces full-disk encryption by itself, so the deciding factor is proving on demand that every analyst's device meets a documented baseline.

Vendors Covered in this Article

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Does Either Platform Enforce Full-Disk Encryption by Default?

Neither Rippling nor Firstbase enforces full-disk encryption on its own, that setting comes from whatever mobile device management policy is applied during enrollment, but both can enforce a standard image at the ordering and provisioning stage that includes encryption as a default rather than an opt-in a busy analyst might skip. The security requirement has to be written into the enrollment policy either way; the platform just determines how consistently that policy actually gets applied across every new device.

The same logic extends past encryption to whatever endpoint detection agent the MSSP standardizes on: if enrollment doesn't force that agent onto every new device before it's handed to an analyst, a single laptop shipped outside the normal process is enough to create a monitoring blind spot on the one team whose job is finding exactly that kind of gap for clients.

What Happens When an Analyst Is Pulled Onto an Incident Response Kit?

Some MSSPs keep dedicated incident response laptops, pre-configured kits pulled off a shelf and handed to whichever analyst is on call, rather than using an analyst's everyday machine for live incident work. That kit needs the same tracking discipline as any other asset, who currently has it checked out, when it was last patched, and whether its forensic tooling licenses are current, and it's exactly the kind of device that falls outside a standard employee-onboarding workflow because it doesn't belong to one person.

A kit that sits unused between incidents is also easy to forget during routine patch cycles, since patching runs typically target devices tied to an active employee record, not a shelf item, which means the kit an analyst grabs during a live incident can end up being the least current device in the whole fleet at exactly the wrong moment.

How Client Security Reviews Actually Use This Data

When a client runs a vendor security review before signing or renewing a contract, one of the questions that comes up is whether the MSSP can quickly produce a current list of every device with access to client environments and confirm each one meets the stated security baseline. An MSSP that can pull that list in minutes because device records live in one system answers that question very differently than one that has to manually check several analysts' laptops before responding.

Where Rippling Wins: A Single Audit Trail

Rippling's advantage for an MSSP is exactly this audit trail: one system recording who has which device, when it was enrolled, and what security policies applied to it, which turns a client's security review from a scramble into an export. That matters more for an MSSP than for most other businesses in this comparison, because the MSSP's own security posture is itself part of what it's selling.

Where Firstbase Wins: Analysts Spread Across Regions

Firstbase's advantage shows up for an MSSP with analysts spread across multiple regions or time zones rather than concentrated in one office, since getting a properly configured device to an analyst quickly, wherever they are, matters when incident response coverage depends on having enough staffed hours around the clock. The tradeoff is that Firstbase doesn't own security policy enforcement itself, so the audit trail a client review asks for still has to come from wherever SSO and MDM policy actually live.

Building the Baseline Before You're Asked For It

The MSSPs that handle a client's security review calmly are the ones that already wrote down their device baseline before any client asked for it, not the ones scrambling to reconstruct it from memory once a prospective client's procurement team sends over a questionnaire. That baseline should state, in writing, what every device is required to run, encryption, endpoint detection, a maximum patch age, and which role signs off that a new device meets it before it's allowed anywhere near client systems.

Having that document ready turns a client's security review into a five-minute conversation instead of a multi-day audit of every analyst's laptop, and it also gives new analysts a concrete standard to be enrolled against on day one rather than whatever configuration happened to be convenient at the time.

Write your device baseline before a client asks for it, and include these items:

  • Full-disk encryption is set through the MDM policy applied at enrollment, since neither platform enforces it on its own.
  • You can produce a current list of every device with access to client environments whenever a security review asks.
  • Endpoint protection and patching are confirmed current, with a record of when the policy was last verified.
  • Incident response kits have their own checkout log and their own patch and tooling license review.
  • Analysts in other regions or time zones receive a properly configured device quickly, wherever they are.
Executive Capability Standard

What Good Looks Like

An MSSP has this under control when it can produce, within minutes, a current list of every device with access to a given client's environment along with proof of its security baseline, and when incident response kits are tracked with their own checkout log separate from individual analysts' assigned laptops.

Building The Capability (5-Stage Skill Ladder)

1. Learn:Inventory every device with access to any client environment, including shared incident response kits, and confirm which ones currently lack a documented security baseline.
2. Do Manually:Write the security baseline, encryption, endpoint protection, patch cadence, into the enrollment checklist for every new analyst device and every incident response kit.
3. Delegate:Assign one security operations lead ownership of confirming device compliance ahead of client security reviews, rather than scrambling to check devices when a review is requested.
4. Automate:Use Rippling's unified device and SSO record to generate an audit-ready device list on demand instead of compiling one manually.
5. Buy:Add a hardware logistics partner if analysts are distributed across regions where getting a compliant device shipped quickly matters for incident response coverage.

How to Get Started

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Rippling

Use Rippling to keep one auditable record of every analyst's device, enrollment date and security policy, ready to produce during a client's vendor security review.

Visit Rippling→

Frequently Asked Questions

Should incident response kits be tracked separately from analysts' everyday laptops?

Yes. A shared kit that rotates between whoever is on call needs its own checkout log and its own patch and tooling license review, separate from the standard onboarding record tied to one employee, since it doesn't have a single owner the way an assigned laptop does.

What should an MSSP be able to produce during a client's vendor security review?

A current list of every device with access to that client's environment, confirmation each one has full-disk encryption and up-to-date endpoint protection, and a record of when that policy was last verified. If producing that list takes more than a few minutes, the underlying tracking, not the review itself, is the actual gap.

Does device encryption alone satisfy most client security requirements?

Rarely by itself. Encryption is usually one line item among several, endpoint detection, patch currency, access logging, and specific requirements vary by client and by the compliance framework they operate under, so confirm the full list with whoever manages that client relationship rather than assuming encryption covers it.

About the numbers

This guide doesn't quote a sourced benchmark. Figures in it are estimates or general guidance, so check them against your own numbers.

Related Guides