Kandji vs Rippling IT for a Custom Software Shop's Fleet
For a custom software shop, the right choice depends more on your contractor mix and existing HR stack than on any single feature: Kandji is Apple-only, while Rippling ties devices to the HR record. The bigger liability is client codebases on laptops held by contractors of six months and full-timers of six years.
Vendors Covered in this Article
Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.
The contractor problem this industry has that others don't
Product engineering firms lean on contractors more than most software companies, bringing in a specialist for a sprint or a launch and then releasing them once the milestone ships. Every one of those laptops touches a client's repository at some point, which means offboarding has to be immediate and complete, not a task that sits in someone's queue for a week. Rippling's device management is tied directly to its HR records, so when a contractor's engagement ends in the system, the device wipe and access removal follow from that same record without a second step. Kandji doesn't hold employment data itself, so its offboarding trigger depends on someone or some integration telling it a person is gone, which works fine once it's set up but adds a step Rippling handles natively out of the box.
Where Kandji pulls ahead once devices are enrolled
Once a MacBook is enrolled, Kandji's strength shows up in the day-to-day: patch enforcement that respects a developer's open terminal session instead of forcing a reboot mid-build, pre-built compliance baselines mapped to common frameworks, and an interface built specifically around Apple's management APIs rather than adapted from a broader HR platform. If your delivery teams are running local development environments, containers, and package managers all day, Kandji's lighter agent and Apple-specific tooling tend to cause fewer of the small frictions that turn into support tickets during a sprint. Those frictions are easy to dismiss individually and expensive in aggregate across a whole delivery team.
Where a mixed fleet changes the calculus
Not every client-facing engineer is on a Mac. If your firm keeps a few Windows machines around for client environments that require them, or your QA and infrastructure staff run Linux, Kandji simply can't manage those devices since it's built for Apple hardware only. Rippling's device management covers Windows and Mac from one console, which matters if you'd rather not run two separate systems for two separate operating systems, even if the Apple-specific controls are less deep than Kandji's once you're inside the Mac fleet specifically. A shop that quotes work across both platforms should weigh this before assuming the Mac-only tool is the obvious default.
The question to answer before you commit
Ask whether your headcount and contractor churn are already managed through Rippling for payroll and HR. If they are, adding its device module keeps one system of record for who has what hardware and when it should be revoked, which is a real advantage for a firm that onboards and offboards contractors on a rolling basis throughout the year. If your HR stack lives elsewhere and your fleet is almost entirely Mac, Kandji's deeper Apple controls and faster setup are worth running as a separate, purpose-built tool rather than folding device management into a platform you're not otherwise using for anything else.
Answer these questions before you commit to either platform:
- Count the Windows and Linux machines in the fleet, since Kandji manages only Apple hardware while Rippling covers a mixed fleet.
- Check whether payroll and HR already run through Rippling, which would keep one system of record for who has which hardware and when to revoke it.
- Make offboarding immediate when a contractor's engagement ends, because every one of those laptops has touched a client's repository.
- Re-check which repositories a contractor's laptop can reach whenever a client swap happens mid-engagement, not only at kickoff.
- Pair device policy with source control permissions, code review, and an offboarding checklist, since MDM alone cannot stop a clone to a personal drive.
What device management can't fix for a code shop
Neither platform stops a contractor from cloning a repository to a personal drive before their access is revoked, or from committing a client's credentials to a public branch by accident. Device policy handles the laptop; source control permissions, code review, and a clean offboarding checklist handle the code itself. Treat the MDM decision as one piece of how you protect client IP, not the whole answer, and you'll spend less time relitigating it after the next contractor rolls off a project.
A mistake that shows up mid-engagement, not at kickoff
The failure mode isn't usually a missing tool, it's a policy that only gets applied at the start of an engagement and never again. A contractor's laptop gets enrolled and configured correctly on day one, then a client swap happens three months in and nobody re-checks which repositories that laptop can still reach. Whichever platform you pick, review access on a schedule tied to project milestones rather than assuming the original setup still matches who a contractor works for today. That review is a five-minute task if you do it on a schedule and a real incident if you don't.
What Good Looks Like
Every contractor and full-time engineer's laptop is enrolled before it touches a client repository, and access to client code is fully revoked the same day an engagement ends, not the week after.
Building The Capability (5-Stage Skill Ladder)
How to Get Started
Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.
Rippling can procure and ship each new engineer's laptop, then automatically wipe and reclaim it the day their contract or employment ends.
Gusto handles payroll and contractor payments for a delivery team that scales up and down by project, without tying that to device management at all.
Frequently Asked Questions
Does Rippling's device management require using Rippling for payroll too?
Rippling's device module works best as part of its broader HR platform, since it draws its offboarding triggers from employment records. You can typically run it on its own, but the automatic tie between an employment change and a device wipe is the main reason firms choose it.
Can Kandji manage a contractor's personal laptop instead of a company-issued one?
Kandji is built to manage company-owned Apple hardware through Apple Business Manager. It's not designed for enrolling a contractor's personal device, so most firms that allow BYOD contractors handle those laptops with lighter controls, such as requiring encryption and a signed access agreement, outside the MDM.
What happens to client code access when a contractor's Kandji-managed laptop is wiped?
A remote wipe through Kandji removes the device's local data and configuration, but it doesn't automatically revoke that contractor's logins to your repositories, cloud accounts, or client systems. Those need to be pulled separately as part of your offboarding checklist.
About the numbers
This guide doesn't quote a sourced benchmark. Figures in it are estimates or general guidance, so check them against your own numbers.
Related Guides
Picking a PEO for a Custom Software Shop: Fixed-Bid or Staff-Aug
How your billing model, fixed-bid or staff augmentation, should shape whether a custom software development company picks Justworks or Rippling.
Rippling vs Firstbase When Client Contracts Set Your Laptop Rules
For custom software studios: why device return dates should follow the client contract, and how Rippling and Firstbase fit project-based staffing.
Rippling vs Gusto When Half Your Team Bills as Contractors
How a custom software shop staffing client projects with a mix of W-2 engineers and 1099 contractors should weigh Rippling, Gusto, and ADP TotalSource.
The Handoff Checklist Custom Software Shops Skip
Scope creep, missed QA sign-off, and rushed handoffs come from the same gap: no enforced checklist. Here's where to put one in a custom software shop.
Make vs Zapier for Custom Software Shops Managing Client Builds
Compare Make and Zapier for running a custom software or product engineering shop, from SOW-to-kickoff handoff to change requests and milestone billing.
Zendesk or Intercom for a Custom Software Shop
A worked example for dev shops choosing a support tool: how ticket volume differs from SaaS, and what actually changes once a warranty period starts.