Device Management & MDM Operations3 min readUpdated September 2026

Kandji vs Rippling IT for a Multi-Site Property Manager

A property management company's site offices each have a computer that two or three people share, a printer nobody outside the building can troubleshoot, and a tablet used for move-in inspections that's been dropped more times than anyone's tracking. Turnover at the site level is constant, and passwords end up written on a sticky note because nobody set up anything better.

Standardizing that across a dozen sites without sending someone to each building takes a specific rollout, not just picking a platform and hoping it spreads. The rollout matters more than the platform choice itself, since either platform will fail the same way if it's applied inconsistently from one site to the next.

Vendors Covered in this Article

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Step one: inventory what's actually shared versus assigned

A site office's computer is usually shared among the on-site staff, while a regional property manager's laptop is assigned to one person. Those need different policies: a shared device needs a generic login with restricted permissions, while an assigned device can be tied to one person's identity and access level. Sort your fleet into these two categories before picking a platform, since the answer changes what you're actually configuring.

Include the inspection tablets in this inventory too, since they're easy to overlook until one goes missing. A site with three tablets rotating between leasing agents needs a clear answer for who's responsible for each one on a given day, not just a device policy.

Step two: pick the platform based on what runs the site offices

If site offices run Windows, which is common given how much property management and accounting software is Windows-first, Rippling IT is the realistic starting point since Kandji doesn't manage Windows at all. A property manager standardized entirely on iPad for inspections and Mac for the regional office is the one case where Kandji's depth on those platforms could make sense instead.

Either way, price the decision against what a dedicated technical hire would cost you first. National wage data puts the median salary for a software developer, a reasonable proxy for the kind of technical role a property manager might otherwise post for, at $135,980 a year1, which is well above what a platform subscription runs across even a large site count.

What breaks when a site rollout skips the inventory step

A regional manager who assumes every site's fleet already matches the standard template, and rolls out a new configuration without checking first, tends to find out mid-rollout that two sites are running an older operating system that can't take the new restrictions, or that a site's printer setup depends on a network configuration the new policy would break. Confirming state before pushing changes avoids turning a routine rollout into an emergency call from a site manager mid-day.

A useful habit is rolling any policy change out to one pilot site first and letting it run for a few days before pushing it everywhere. A site manager who hits a snag on a pilot site is a manageable problem; the same snag hitting every site on the same afternoon is not.

Step three: build a remote repair process before you need it

A site office an hour from the regional headquarters can't wait for someone to drive out every time a shared computer needs a password reset. Remote management should get a technician into that machine without a site visit for anything short of a hardware failure, which is the entire point of centralizing this in the first place rather than leaving each site to fend for itself.

Test this before you actually need it, not during a real outage. Walk through a mock password reset or software issue on a test device and confirm your remote tools actually reach it the way you expect, since discovering a gap in coverage during a live problem is far more costly than finding it during a dry run.

Step four: standardize a new site's setup before it opens, not after

The most common mistake is treating each new property or site office as its own project, configured from scratch by whoever's available that week. Build a standard configuration once, apply it to every new site the same way, and a newly opened property's office is protected from day one instead of during a scramble weeks later.

Say your company adds a new property to the portfolio next quarter. Under a standardized process, the site office's computer and inspection tablets arrive pre-configured to the same baseline as every other site, and the leasing team is working with protected devices on their first day rather than whatever was quickly set up the week before opening.

Document the standard configuration itself somewhere durable, not just in one person's head. A property manager that grows past its original regional operations lead needs that checklist to survive the transition, and a written standard is far easier to hand off than tribal knowledge.

A repeatable multi-site rollout follows this order:

  1. Inventory each site to separate shared computers, which get a generic restricted login, from assigned laptops tied to one person's identity.
  2. Pick the platform based on what the site offices run, since Kandji does not manage Windows at all and Rippling IT covers that fleet.
  3. Set up remote repair before you need it, so a technician can reset a shared computer without driving to the site.
  4. Build one standard configuration and apply it to every new site before it opens, so the office is protected from day one.
Executive Capability Standard

What Good Looks Like

A well-run property manager can show that a newly opened site's office is configured to the same standard as every other site on day one, and can remotely fix a shared device's common issues without a site visit.

Building The Capability (5-Stage Skill Ladder)

1. Learn:Inventory which devices at each site are shared versus individually assigned before designing a single policy for both.
2. Do Manually:Write a standard site-office setup checklist and apply it by hand at your next property opening.
3. Delegate:Assign one person at the regional or corporate level, not each site manager individually, to own device setup.
4. Automate:Deploy Kandji or Rippling IT so a new site's office follows the same automated setup instead of a fresh manual configuration each time.
5. Buy:Bring in a specialist to review whether your current remote-repair process actually reaches every site without a technician driving out.

How to Get Started

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Frequently Asked Questions

How do we handle a shared site-office login when three different people use the same computer?

Use one generic account with restricted permissions on the shared computer rather than three individual logins competing for the same machine. Rely on your property management software's own user-level login for accountability, since that system needs to know who did what, not the operating system.

Should inspection tablets be locked to a single app?

Yes. A tablet used only for move-in and move-out inspections has no reason to have a browser or email available, and locking it into a single-app kiosk mode both protects it and makes it harder for a tenant or vendor to fiddle with during a walkthrough.

What happens when a leasing agent leaves and an inspection tablet is unaccounted for?

Remotely wipe and lock it the same day, and treat a missing tablet the same as a lost laptop rather than assuming it will turn up in a desk drawer. Both platforms support remote lock and wipe, which only works if the device was actually enrolled in the first place.

Should the regional office's finance and accounting laptops be on a stricter policy than site offices?

Yes, generally. A laptop handling rent rolls, owner statements, and vendor payments across your whole portfolio carries more risk than a single site's shared computer, and stricter restrictions and more frequent patch checks are worth the extra friction for that smaller set of devices.

What's the actual cost of managing this by hand across a dozen sites?

Price a dedicated hire against a platform honestly. SHRM's 2025 benchmarking puts the median time-to-fill for a nonexecutive position at 44 days from the requisition opening to an offer accepted2, and that's before the ongoing salary, which is a useful pair of numbers to weigh against a per-device platform subscription across your actual site count.

Sources

Where we quote a benchmark, we show its source. Other figures in this guide are estimates or general guidance, so check them against your own numbers.

  1. Annual wage, Software Developers (SOC 15-1252), US all industries. BLS OEWS May 2025, 2025.
  2. Median time-to-fill, requisition open to offer accepted (SHRM 2025). SHRM 2025 Recruiting Executives Benchmarking data brief (PDF), 2025.

Related Guides