Device Management & MDM Operations3 min readUpdated September 2026

Kandji vs Rippling IT for a Freight and 3PL Operation

Freight and 3PL operations run mostly on Windows and Android, so Kandji's Apple-only coverage fits little of the fleet, and Rippling IT's broader reach is closer to what is needed. Even so, neither tool manages the warehouse scanners, which typically run on a vendor-specific console outside both platforms.

Even so, neither tool solves the whole problem here, because the warehouse scanner fleet typically runs on its own vendor-specific management system entirely outside both platforms.

Vendors Covered in this Article

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Why this is mostly not an Apple fleet

Dispatch offices run Windows because that's what most transportation management systems are built for. Drivers, whether company employees or owner-operators, use whatever tablet or phone their carrier or broker requires, which skews Android as often as it skews Apple. Warehouse floor staff scan freight on ruggedized Android handhelds built for drops and dust, not office use. Kandji's value proposition, deep native control over Mac and iPhone, simply doesn't apply to most of what a freight operation actually runs.

What Rippling IT covers, and what it doesn't

Rippling IT's coverage across Windows and Mac (and Linux, if any of your systems run on it) fits the dispatch office directly, and it ties a new dispatcher's or ops coordinator's laptop setup to the same hiring record used for payroll. What it generally doesn't reach is the ruggedized Android scanner fleet on the warehouse floor, which almost always runs its own vendor management console tied to the scanning hardware and software rather than a general-purpose MDM platform.

The owner-operator device problem

If your fleet includes owner-operators rather than only W-2 drivers, their phones and tablets are their own property, not yours, and enrolling them in company device management usually isn't appropriate or even legally straightforward. Whatever tracking or communication app they run for your loads should be handled as a scoped app-level integration, not full-device MDM. Reserve actual device enrollment for company-owned dispatch and warehouse hardware, and treat owner-operator devices as outside your management boundary entirely.

Comparing three realistic approaches

Approach one: manage nothing beyond basic password policy, which works only for a very small operation with a handful of dispatch PCs and no real compliance pressure. Approach two: run Rippling IT across the dispatch and back-office Windows fleet, and handle the warehouse scanners through their vendor's own console, accepting two systems as a reasonable division of labor rather than a failure to consolidate. Approach three: add Kandji only if you separately run a meaningful number of Apple devices, for example iPads issued to yard supervisors, which is common enough to be worth checking but isn't the default for this industry.

Most 3PLs that have actually made this decision land on approach two, not because it's the tidiest answer, but because forcing a single platform to cover both a Windows dispatch office and a scanner fleet it wasn't built for usually means fighting the tool instead of using it. Accepting two systems, one for people-facing devices and one for warehouse hardware, tends to cause fewer support tickets than pretending one platform can do both jobs well.

A staffing question worth asking before buying either tool

Say your dispatch office is small enough that you're weighing whether to hire a part-time IT person instead of adopting a platform. National wage data puts the median salary for a general operations manager, a role often stretched to cover IT duties at a small 3PL, at $105,770 a year1, which is a useful anchor even if you're not filling that exact title: a platform subscription that automates provisioning and offboarding is often cheaper than adding headcount purely to manage a dispatch office's dozen laptops by hand.

Timing a platform switch around peak season

Freight has a real peak season, and migrating dispatch laptops to a new platform during it is how a routine software update turns into a missed pickup. Plan any rollout for a slower stretch of the calendar, migrate one dispatcher's machine first and confirm the TMS and load-board software still work exactly as expected before touching the rest of the office, and keep the old setup available as a fallback for the first week rather than removing it immediately. A logistics office running near capacity every day of the week doesn't get a natural maintenance window, so you have to create one deliberately.

To switch platforms without disrupting dispatch, follow these steps:

  1. Schedule the rollout for a slower stretch of the calendar, away from freight peak season.
  2. Migrate one dispatcher's machine first, before touching the rest of the office.
  3. Confirm the TMS and load-board software still work exactly as expected on that machine.
  4. Move the remaining dispatch and back-office machines only after that first test passes.
  5. Leave the warehouse scanners on their vendor console throughout, since neither platform reaches them.
Executive Capability Standard

What Good Looks Like

A freight operation with device management under control can provision a new dispatcher's laptop the day they're hired and knows exactly which system, company MDM or a scanner vendor's console, governs every device on the floor.

Building The Capability (5-Stage Skill Ladder)

1. Learn:Map every device category separately: dispatch Windows PCs, warehouse Android scanners, and driver-facing tablets, noting which are company-owned.
2. Do Manually:Keep a simple provisioning checklist for dispatch and back-office laptops until the office is large enough to justify a platform.
3. Delegate:Assign warehouse scanner administration to whoever manages that vendor relationship, separate from whoever handles dispatch office laptops.
4. Automate:Move dispatch and back-office laptop provisioning into Rippling IT so it's tied to the same hiring record used for payroll.
5. Buy:Add Kandji specifically if a meaningful number of Apple devices, like yard supervisor iPads, are in regular use alongside the Windows fleet.

How to Get Started

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Frequently Asked Questions

Can Rippling IT manage our warehouse scanners?

Usually not. Ruggedized Android scanners built for warehouse use typically run their own vendor-specific management console tied to the scanning hardware and software, separate from general-purpose platforms like Rippling IT or Kandji. Budget for that vendor's device setup as its own line item.

Should we enroll an owner-operator's tablet in our device management platform?

No. An owner-operator's device is their own property, and enrolling it in company MDM raises real legal and practical problems. Handle load tracking or communication through a scoped app the owner-operator installs themselves, and limit actual device enrollment to hardware your company owns.

Does Kandji make sense for a freight operation at all?

Only if you separately run a real number of Apple devices, such as iPads issued to yard or terminal supervisors. For most freight and 3PL operations, the dispatch and back-office fleet is Windows-heavy enough that Rippling IT's cross-platform coverage is the more useful starting point.

Sources

Where we quote a benchmark, we show its source. Other figures in this guide are estimates or general guidance, so check them against your own numbers.

  1. Annual wage, General and Operations Managers (SOC 11-1021), US all industries. BLS OEWS May 2025, 2025.

Related Guides