Kandji or Rippling IT for a Building Materials Supplier
For a multi-branch building materials supplier, branch sprawl should drive the choice more than whether the office runs Mac or Windows. Kandji suits branches standardized on Apple devices, while Rippling IT gives a regional manager one console across mixed Windows and Mac branches. Yard handhelds usually sit outside both, under your inventory vendor's console.
The branch-by-branch nature of this business is the main thing that should drive the choice, more than whether your office runs Mac or Windows.
Vendors Covered in this Article
Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.
Why branch sprawl is the real problem, not the operating system
A single-location business worries about which devices it has. A multi-branch supplier worries about which branch has which device, and whether the branch manager who set it up two years ago documented anything. Before comparing Kandji and Rippling IT, get an honest count of devices per branch, because the platform decision matters less than whether you have any central visibility into what's out there at all right now.
Where Kandji fits if your branches run Apple gear
Some suppliers standardize on iPads for the counter and yard because they hold up reasonably well and are simple for staff to learn. If that's your setup, Kandji's Apple-native controls, enrollment through Apple Business Manager so a replacement iPad ships pre-configured to a branch, and enforced passcodes for a device that sits at an open counter, fit the profile. It won't manage the Windows PC most branches also keep for accounting and ordering, so a fully Apple counter fleet still leaves that machine outside its reach.
Where Rippling IT fits a mixed branch fleet
For branches running a mix of Windows POS terminals, office PCs and the occasional Mac, Rippling IT's single console across operating systems means a regional manager can see every branch's devices in one place instead of calling each location to ask what's actually installed. Tying provisioning to hiring records also helps with counter staff turnover, which tends to run higher at the branch level than in a home office.
The yard handheld problem
Yard and warehouse handhelds for pulling inventory are typically ruggedized Android devices running their own inventory system's app, and they usually sit outside both Kandji and Rippling IT's scope, managed instead through whatever console your inventory or ERP vendor supplies. Don't expect either platform to solve yard device management. Budget for that separately, and use Kandji or Rippling IT for the counter, office and delivery driver devices that actually fall within their reach.
A rollout checklist for a multi-branch supplier
Start with one branch, not all of them at once. Confirm the branch's POS and ordering software still work correctly after enrollment, document how long the rollout actually took including any support calls, and only then move to the next branch using that documented process. A rollout that works cleanly at branch one and gets rushed at branch six is how a supplier ends up with the same inconsistent, undocumented device sprawl it was trying to fix.
To roll out a platform across branches, follow these steps:
- Start with one branch instead of all of them at once, and count the devices there first.
- After enrollment, confirm the branch's POS and ordering software still work correctly.
- Document how long the rollout actually took, including any support calls it generated.
- Move to the next branch using that documented process, and build a standard device kit for any new branch before it opens.
What it costs to keep managing branches by hand
Say you're deciding whether to hire a regional ops manager to visit branches and fix device issues in person instead of adopting a central platform. National wage data puts the median salary for a general operations manager at $105,770 a year1, and that role would still spend a meaningful share of its time on the road rather than actually fixing anything remotely. A platform that lets you push a policy change or lock a lost device from one screen, regardless of which branch it's at, usually saves more time than a traveling ops role would, though the two aren't mutually exclusive at a large enough supplier.
Standardizing a new branch before it opens, not after
The best time to get a branch's devices right is before it opens for business, not six months later once staff have already improvised their own workarounds. Build a standard device kit for a new branch, POS terminal, office PC, and however many counter devices your format calls for, enrolled and configured before the branch's opening day. Treating device setup as part of new-branch launch, the same way you'd plan signage or inventory, prevents the exact sprawl problem this checklist started with.
Keep that standard kit written down somewhere every future branch manager can find it, not just in the memory of whoever ran the last opening. A supplier that opens branches only once every year or two tends to lose that institutional knowledge between openings, which is exactly how the same standardization work ends up getting redone from scratch each time.
What Good Looks Like
A multi-branch supplier with device management under control can tell you, from one screen, exactly which devices exist at every branch and who's responsible for each one, without calling a branch manager to ask.
Building The Capability (5-Stage Skill Ladder)
How to Get Started
Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.
For a supplier running mixed POS and office hardware across several branches, Rippling IT gives a regional manager one console instead of calling each location to ask what's installed.
If branch payroll runs through Gusto, use its hire and termination events as the trigger for issuing or reclaiming counter and office devices at that specific location.
Frequently Asked Questions
Will either platform manage our yard inventory handhelds?
Probably not. Ruggedized handhelds used for yard and warehouse inventory typically run their own vendor-specific management system tied to the inventory software, separate from Kandji or Rippling IT. Treat handheld management as its own project rather than assuming a general MDM platform covers it.
Should each branch manage its own devices, or should it be centralized?
Centralized, if you can manage the change. Branch-level device management is usually how sprawl happens in the first place, since each location makes its own undocumented decisions. A central platform with one regional owner reduces the odds of finding an unmanaged laptop two years after a branch manager who set it up has moved on.
How should we handle delivery driver tablets differently from branch office devices?
Driver tablets travel and take more physical wear, so prioritize passcode enforcement and remote lock over app restrictions, since the main risk is a lost or stolen device rather than a driver misusing software. Branch office devices carry more sensitive data (customer accounts, pricing), so access control matters more there than ruggedness.
Sources
Where we quote a benchmark, we show its source. Other figures in this guide are estimates or general guidance, so check them against your own numbers.
- Annual wage, General and Operations Managers (SOC 11-1021), US all industries. BLS OEWS May 2025, 2025.
Related Guides
Rippling vs Firstbase for Multi-Branch Building Material Suppliers
Counter staff, yard crews, and field sales reps use different hardware. Here's how to match a device tool to each one at a building materials supplier.
Justworks vs Rippling for a Building Materials Yard's Seasonal Swing
A worked example for a building materials supplier balancing steady yard staff against seasonal delivery drivers when choosing Justworks or Rippling.
Rippling vs Gusto for Building Material Suppliers With Drivers
Comparing Rippling, Gusto, and a PEO for yards mixing hourly warehouse staff, CDL delivery drivers, and commissioned outside sales reps.
Zendesk vs Intercom for a Building Materials Supplier
Contractors calling a building materials supplier want delivery status and credit answers fast. Here's how to set up Zendesk or Intercom for that.
Make vs Zapier for Commercial Building Material Suppliers
Follow one order from quote to delivery at a commercial building material supplier to see whether Zapier, Make or Workato fits your actual workflow.
How to Set Up SOPs for a Building Materials Supplier
A step-by-step runbook for setting up receiving, will-call, credit hold, and quote-to-order SOPs across Process Street and SweetProcess.