Field Service Hourly Rate: How to Calculate What to Charge

Your field service hourly rate should be your total annual cost of putting a technician on the road, divided by the hours you can actually bill, plus your target margin. The number that catches owners out is billable hours: after time off, driving, and admin, a full-time technician may bill well under 2,080 hours a year.

The worksheet below walks through each input, with an example you can replace with your own numbers.

Vendors Covered in this Article

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

What costs belong in the rate?

Add up everything it costs to keep one technician working for a year:

  • Technician pay. Wages, overtime, payroll taxes, benefits and paid time off. Build it with the loaded-cost method from your payroll figures.
  • Vehicle. Payments or depreciation, fuel, insurance, maintenance, tolls, parking and tracking equipment.
  • Tools and consumables. Hand tools, test equipment, uniforms, safety gear, and small parts you don't bill separately.
  • Insurance and licensing. General liability, workers' compensation, trade licenses and certifications.
  • Software and phones. Scheduling and invoicing tools, mobile devices and data plans.
  • Overhead share. A fair share of office rent, admin and dispatch staff, marketing and management time.

Use last year's actuals wherever you can. Ask your accountant which costs belong in direct cost and which in overhead, and be consistent.

How do you calculate billable hours?

Start with 2,080 paid hours for a full-time employee, then subtract what you can't bill:

  1. Subtract paid holidays, vacation and sick time.
  2. Subtract training, safety meetings and shop time.
  3. Subtract drive time between jobs, unless you charge for travel.
  4. Subtract admin time, such as reading job notes, ordering parts and closing out paperwork.
  5. What remains is the billable time you can charge for. Divide it by paid hours to get billable utilization.

Track this from your job data. If your team logs on-site and drive time on every job in a tool such as Jobber or Housecall Pro, you can see actual utilization instead of a guess. Utilization varies by trade and route density, so measure yours.

What does a worked example look like?

Say a technician costs the following in a year. In this example, loaded pay is $70,000, vehicle costs are $12,000, tools and consumables are $3,000, insurance and licensing are $4,000, and an overhead share is $15,000. In this example, the total is $104,000.

Now the hours. In this example, 2,080 paid hours minus 300 for time off and training leaves 1,780. Say driving and admin take about 30 percent of that, so billable hours are about 1,250.

In this example, cost per billable hour is $104,000 divided by 1,250, or about $83. In this example, to earn a 20 percent margin on price, divide by 0.8, which gives about $104 an hour. That's your target rate before any market check.

Notice how sensitive it is. In this example, if utilization falls and billable hours drop to 1,000, the same costs push the break-even rate to $104 and the target rate to $130. Route planning and scheduling matter as much as pricing.

How do you test the rate against the market?

The calculated rate is a floor to work from, not the price you must charge. Check it against reality:

  • Competitor rates in your area. Call or read public price lists, and note the difference between hourly and flat-rate models.
  • Job type. Emergency, after-hours and specialty work can justify higher rates than routine maintenance.
  • Customer type. Commercial customers on contracts may accept a lower rate in exchange for volume, while residential customers often prefer flat prices.
  • Parts and materials. Decide your markup policy separately, and don't hide overhead in hourly labor if your parts pricing already covers it.
  • Local rules. Some jurisdictions have licensing or disclosure requirements for estimates and pricing, so check with your state or trade association.

If your calculated rate sits well above the market, look at cost and utilization before you cut prices. If it's below, you may have room to raise it.

How do you turn an hourly rate into flat-rate prices?

Many customers prefer a fixed price. Convert by estimating the time each common job takes, including a fair share of travel and the typical complications, then multiply by the hourly rate and add parts. Review the resulting price list against how long the jobs actually take.

Track actual time against estimates for a few months. If jobs run over, either your estimates are low or your team needs coaching. Compare how each field service platform records job time in this platform comparison, and read the technician dispatch board setup guide to raise utilization through better routing.

For related reading, see field service scheduling automation with Housecall Pro.

How often should you revisit the rate?

At least once a year, and whenever a major cost changes. Compensation rises over time. The BLS Employment Cost Index reports total compensation for civilian workers up 3.4 percent over the 12 months ending March 20261, and fuel, insurance and parts costs move on their own schedules.

Set a yearly calendar reminder to update the inputs, and adjust rates before the busy season, not during it. Communicate increases to customers clearly and in advance.

Executive Capability Standard

What Good Looks Like

A field service rate built from the true annual cost of a technician, actual billable utilization and a target margin, checked against the market and reviewed every year.

Building The Capability (5-Stage Skill Ladder)

1. Learn:Learn your true annual cost per technician, and how many hours each one actually bills.
2. Do Manually:Fill in the worksheet with last year's actuals, and compare the result with what you charge now.
3. Delegate:Assign the office manager to track utilization by technician and report it monthly.
4. Automate:Record on-site and drive time on every job in your field service software so utilization is measured automatically.
5. Buy:Adopt field service management software when you can no longer track time, routes and job costs by hand.

How to Get Started

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Jobber

Fits when you want job costs, scheduling and invoicing tracked so billable utilization is measured, not guessed.

Visit Jobber→
Housecall Pro

Fits when you run residential service work with flat-rate pricing and want dispatch and job data in one place.

Visit Housecall Pro→

Frequently Asked Questions

How do I calculate an hourly rate for a field service business?

Add the annual cost of a technician, including pay, vehicle, tools, insurance and an overhead share. Divide by the hours you can actually bill, then divide by one minus your target margin. Check the result against local market rates before you set prices.

What is billable utilization in field service?

It's the share of a technician's paid hours that you can charge to customers. Time off, training, driving and admin reduce it. Measure it from real job records to see why your effective rate is lower than the hourly figure suggests.

Should I charge for drive time?

Some businesses do, through trip charges or by billing travel time, and others build travel into the rate. Which works depends on your market and customer type. Whatever you choose, state it clearly in estimates and agreements, and check any local rules on disclosure.

Is hourly or flat-rate pricing better?

Neither is always better. Hourly pricing suits uncertain or complex work, while flat rates give customers certainty and reward efficient technicians. Many businesses use both. Base flat prices on your hourly rate and real job times, and review them regularly.

Sources

Where we quote a benchmark, we show its source. Other figures in this guide are estimates or general guidance, so check them against your own numbers.

  1. ECI total compensation growth, civilian workers (12-month change). BLS Employment Cost Index, 2026.

Related Guides