Hourly Workforce Time Tracking & Scheduling3 min readUpdated September 2026

Buddy Punch vs Deputy for Non Driving Freight Staff

Temperature controlled and hazmat freight operators need a separate time and attendance system for loaders, washers and yard staff, because hours of service rules cover only drivers. The non driving hourly workforce often gets whatever tracking is left over, while wage growth for hourly labor keeps making unmanaged overtime more costly.

Vendors Covered in this Article

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Does hours of service software cover loaders and yard staff?

Hours of service software tracks drivers specifically and has nothing to say about a wash bay crew or a dock loader working a double shift during a volume spike. Treating your HOS system as if it handles all time compliance is a common and expensive assumption, since the non driving staff still need a real time and attendance system, and it is usually not the same tool.

Pitfall: hazmat and cold chain certifications tracked separately from hours

Loaders and washers handling hazmat or temperature controlled freight often need current certifications, and a facility that tracks certification expirations in one system and hours in another misses the connection between the two. Deputy's scheduling can filter shifts by required qualifications and warn you when training or certification records expire, so confirm how that works for your driver and equipment requirements.

Pitfall: overtime that nobody anticipates because volume is genuinely lumpy

Cold chain and hazmat freight volume often arrives in bursts tied to specific customer shipments rather than a steady weekly pattern, which makes overtime feel unpredictable even when it is not entirely random. Buddy Punch's overtime alerts at least catch the accumulation mid week, giving a supervisor a chance to redistribute hours before the pay period closes, even without predicting the burst in advance.

How does wage pressure erode margin on a fixed rate lane?

A fixed rate lane contract signed a year or two ago may no longer reflect what it actually costs to staff, since broad hourly wage growth has kept climbing steadily across the sector. Reviewing labor cost against contract rates periodically, using the accurate hours a real time and attendance system captures, is the only way to catch that erosion before it shows up as a shrinking margin nobody can quite explain. This review is cheap to run once the underlying hours are trustworthy, and expensive to skip once a contract renewal arrives and nobody can say with confidence what the lane actually costs to run today.

Pitfall: treating non driver hourly staff as an afterthought in the tool decision

Because drivers get the compliance attention, the choice of time and attendance tool for the rest of the workforce often gets made quickly and without much evaluation. Given the certification tracking and volume swings specific to hazmat and cold chain operations, it is worth the same deliberate evaluation given to driver compliance software, since the cost of getting this group's hours wrong is not smaller, just less visible. A wash bay or dock incident involving an uncertified worker is exactly the kind of expensive, visible failure that a rushed tool decision eventually produces.

Before choosing a tool for loaders, washers and yard staff, check these points:

  • Confirm the tool tracks the non driving hourly workforce, since hours of service software covers drivers and says nothing about a wash bay crew or dock loaders.
  • Check whether hazmat and cold chain certifications can be flagged before a shift is assigned, as Deputy's scheduling can do for an expired or missing certification.
  • Set overtime alerts, such as Buddy Punch's, so bursts of volume tied to specific customer shipments do not turn into surprise overtime.
  • Separate temperature controlled and ambient labor in reporting so you can see whether cold chain work actually costs more in labor.
  • Review labor cost against fixed rate lane contracts periodically, using accurate hours from the time and attendance system.
  • Do not assume one configuration fits every terminal, since a small ambient terminal and a large hub have different compliance and scheduling needs.

Pitfall: not separating temperature controlled and ambient labor in the reporting

A facility running both temperature controlled and ambient freight sometimes tracks all warehouse labor as one undifferentiated pool, which makes it impossible to see whether cold chain work is actually costing more in labor than ambient handling, or whether the premium customers pay for temperature controlled service is covering the real labor cost of maintaining it. Tag shifts by freight type where the software allows it, even before finance asks for the breakdown, since the data is cheap to capture at clock in and expensive to reconstruct after a pricing review reveals nobody actually knows the answer.

Pitfall: assuming the same tool works identically at every terminal

A multi terminal operation sometimes rolls out a single configuration across every location without accounting for the fact that a smaller terminal handling mostly ambient freight has a genuinely different compliance and scheduling need than a large hub running cold chain and hazmat around the clock. Configure certification gating and overtime thresholds per terminal where the tool allows it, rather than forcing one national configuration onto operations that do not actually look alike, since a one size configuration usually ends up either too lax at the high risk terminal or too burdensome at the simple one. Review the per terminal configuration whenever a facility's freight mix changes meaningfully, since a terminal that used to handle mostly ambient freight and has since picked up hazmat volume needs its rules updated to match, not left at the original, lighter setup.

Executive Capability Standard

What Good Looks Like

Good non driver time tracking means every loader, washer and yard worker's hours and required certifications are visible together, with overtime flagged mid week rather than discovered after volume spikes have already passed.

Building The Capability (5-Stage Skill Ladder)

1. Learn:List every hazmat or cold chain certification your non driving staff need and check how expirations are currently tracked against schedules.
2. Do Manually:Build a simple certification expiration calendar and cross check it against the upcoming shift schedule by hand for one month.
3. Delegate:Assign a yard or facility supervisor ownership of certification and overtime review separate from driver compliance duties.
4. Automate:Move non driving staff onto Buddy Punch or Deputy with overtime alerts configured for the volume patterns specific to your lanes.
5. Buy:Where certification gating matters, add Deputy's scheduling checks so an expired certification blocks a shift assignment automatically.

How to Get Started

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Frequently Asked Questions

Do Buddy Punch or Deputy handle hours of service for drivers?

No, neither tool is built for federal hours of service compliance, which requires dedicated ELD software. Both are meant for the hourly, non driving workforce, loaders, washers, yard staff, around your drivers, and should be treated as a separate system rather than a replacement for driver compliance tools.

Can either tool track hazmat or cold chain certifications?

Deputy's scheduling can flag an expired or missing certification before assigning a worker to a shift that requires it, which is a meaningful advantage for hazmat or cold chain operations. Check whether the time tracking tool you choose supports certification gating, and weigh that carefully if your facility depends on it.

How do we know if wage pressure is actually eroding our lane margins?

Compare actual labor cost per lane, using accurate hours from your time and attendance system, against the contracted rate at least quarterly. Wage growth has been running in the mid single digits percentage wise across the broader workforce recently, which is worth checking against your own fixed rate contracts rather than assuming they still reflect current cost.

About the numbers

This guide doesn't quote a sourced benchmark. Figures in it are estimates or general guidance, so check them against your own numbers.

Related Guides