Hourly Workforce Time Tracking & Scheduling3 min readUpdated September 2026

Scheduling Freelance Production Talent Around a Campaign Deadline

Marketing agencies staff a campaign deadline best with a scheduling process that flexes as fast as the workload does. A launch or client pitch can turn a normal week into a crunch overnight, and the hourly staff who absorb it, production coordinators, junior creatives and part-time account support, need scheduling that adjusts just as quickly.

Buddy Punch and Deputy both handle hourly time tracking, but an agency's variable pace makes the scheduling side matter more than it would at a steadier business, which tips the comparison in a specific direction.

Vendors Covered in this Article

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Why agency staffing swings harder than most service businesses

A single new client win or a major campaign launch can spike an agency's hourly workload for two or three weeks and then drop back down once the deliverables ship. That's a different pattern than a business with steady year-round demand, and it means the scheduling tool has to handle short bursts of extra staffing without becoming a permanent fixture in the weekly schedule once the crunch passes and the team is back to a normal pace.

Deputy's fit: standing up a short-term production push

Deputy's shift-based model is well suited to an agency's bursty workload. A campaign crunch can be staffed as a defined block of extra shifts, filled by whoever on the part-time bench is available, without disrupting the recurring schedule for everyone else. Once the campaign ships, those shifts simply end rather than lingering as a permanent addition to the calendar that someone has to remember to remove.

A short-term production push can be staffed in a few steps:

  1. Decide which hourly roles the push needs, such as production coordinators, junior creative support or part-time account staff, and leave salaried exempt account managers out of the tool.
  2. Post the open shifts in a shift-based tool like Deputy, so qualified part-time staff can claim them directly instead of a manager calling around.
  3. Confirm whether each freelancer is a genuine independent contractor, who stays off the employee tool, or a short-term hourly hire, who belongs in it.
  4. End the extra shifts when the campaign ships, so they do not linger as a permanent addition to the recurring calendar.

Buddy Punch's fit: verifying remote creative and production hours

Agencies increasingly run distributed teams, and Buddy Punch's GPS and IP-based verification confirms a remote hourly staffer's clock-in is legitimate rather than trusting a self-reported time entry. For an agency that's had a dispute over hours with a part-time hire before, that verification is worth more than the scheduling flexibility Deputy offers, especially for roles with a fairly steady weekly pattern rather than the bursty campaign work.

The mistake of treating every hourly hire the same way

Agencies often have two different kinds of hourly staff: a steady part-time account coordinator working the same days every week, and a rotating bench of production freelancers brought in project by project. Running both through identical scheduling rules usually underserves one group. The steady coordinator doesn't need a shift marketplace, and the rotating freelance bench doesn't need a fixed weekly schedule. Configure different rules for each group rather than forcing a single pattern on both.

Watching overtime during a campaign crunch

The easiest overtime mistake at an agency is letting a coordinator who's already working close to a full week pick up extra hours during a crunch without anyone checking the running total first. Both tools can flag hours approaching the weekly threshold before a new shift is approved, which matters most exactly when everyone's focused on hitting a launch date rather than watching the payroll math.

The same risk applies to swapping shifts between a busy and a quiet account. A coordinator who picks up hours on a crunch account while already scheduled on their usual account can end up over the weekly threshold without either account manager realizing the other one added hours. Whoever approves swaps needs visibility into the person's total hours across every client they support, not just the one account requesting the extra help, since that's the only way to catch the overage before it turns into an unbudgeted payroll surprise the following week, right around the same time a client is asking why the account's margin looks thinner than planned.

Tagging hours by client so agency margins stay visible

Beyond payroll, hourly staffing costs directly affect a client engagement's profitability, especially on a retainer or fixed-fee account where extra hours during a crunch don't automatically mean extra revenue. Tagging shifts by client or campaign, not just recording a daily total, gives account leads a much clearer picture of which engagements are actually absorbing the staffing swings and which are running lean and steady.

That visibility matters most for retainer clients specifically, since a campaign crunch that quietly eats into a fixed-fee account's margin is the kind of thing that's much easier to catch in real time, from tagged shift data, than to reconstruct at the end of the quarter when someone finally asks why that account's profitability dropped. Set the tagging convention up front, before the next crunch hits, rather than trying to retrofit it onto weeks of already-recorded, untagged hours after the fact.

Executive Capability Standard

What Good Looks Like

Good workforce management at an agency means a sudden campaign crunch can be staffed quickly without disrupting everyone else's schedule, hours for both steady and rotating hourly staff are recorded accurately, and overtime doesn't quietly accumulate during exactly the weeks when no one's watching for it.

Building The Capability (5-Stage Skill Ladder)

1. Learn:Review the last few campaign crunches and note how staffing was actually pulled together, and how much of it went through informal texts and calls.
2. Do Manually:Staff a crunch by asking for volunteers in a group chat and tracking hours on a shared spreadsheet.
3. Delegate:Put a production lead in charge of building short-term staffing plans for known campaign deadlines.
4. Automate:Move the hourly production bench onto a shift tool like Deputy so open shifts get filled through the app instead of a manager's phone.
5. Buy:Add overtime alerts and shift tagging by client or campaign so hours map cleanly to project billing without manual reconciliation.

How to Get Started

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Frequently Asked Questions

Do salaried account managers need to use either tool?

No, salaried exempt staff don't need hourly payroll time tracking. Scope either tool to the hourly roles, production coordinators, junior creative support, part-time staff, whose pay is actually tied to hours worked.

How do we handle a freelancer brought on just for one campaign?

If that person is a genuine independent contractor invoicing for a project, keep them off the employee time-tracking tool entirely. If they're being brought on as a short-term W-2 hourly hire, a shift-based tool like Deputy handles a defined block of temporary shifts more naturally than a fixed weekly schedule.

What's the fastest way to staff up for a sudden campaign launch?

Post the open shifts in a shift-based tool like Deputy and let qualified part-time staff claim them directly, rather than a manager calling around to piece together coverage. That shifts the work from a manager's phone calls to a self-service process the team can move through faster.

About the numbers

This guide doesn't quote a sourced benchmark. Figures in it are estimates or general guidance, so check them against your own numbers.

Related Guides