Hourly Workforce Time Tracking & Scheduling3 min readUpdated September 2026

Time Tracking for Techs Who Work at Client Sites

An IT consulting firm or managed service provider has a problem most software companies don't: the hourly work happens at a client's office, not the firm's own, and the hours a technician logs there often become the client's invoice. Getting that record wrong doesn't just create a payroll headache, it creates a billing dispute with someone else's finance department.

Buddy Punch and Deputy both handle location-aware time tracking, but they lean different directions: one toward proving a technician was actually on site, the other toward scheduling which technician goes to which site in the first place.

Vendors Covered in this Article

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Why location matters more here than the hours themselves

In most hourly jobs, the question is simply how many hours someone worked. In IT consulting, the question is usually which client site someone worked at, since that determines which invoice the hours land on. A technician who splits a day between two clients needs those hours split accurately too, not lumped into one daily total that has to be reconstructed from memory at the end of the week.

Buddy Punch's fit: geofenced punches per client site

Buddy Punch's GPS geofencing can restrict a clock-in to a specific radius around a client's address, which is useful for confirming a technician was actually where the invoice says they were. Combined with photo-on-punch, it creates a record that holds up if a client ever questions a billed hour. For a firm that's had a client dispute a timesheet before, that verification is worth more than almost any other feature.

It's less built for juggling which technician gets dispatched where. That dispatch and scheduling layer usually lives in a separate field-service or ticketing tool, with Buddy Punch just capturing the hours once someone's on site.

Deputy's fit: building the site rotation across a team of techs

Deputy is stronger on the scheduling side: assigning technicians to specific client sites or on-call rotations, letting them see their upcoming assignments, and swapping coverage when someone's out. For a firm with a handful of recurring client contracts, each needing a technician on a set day each week, Deputy's shift structure maps naturally onto that pattern.

Its site-level GPS verification isn't as granular as Buddy Punch's geofencing, so a firm mainly worried about proving hours to a skeptical client may still want that feature specifically.

Splitting hours across multiple clients in one day

The operational habit that matters most here is requiring a punch out and back in when a technician moves between client sites, rather than one long shift split manually afterward. A single continuous punch covering two client visits forces someone to guess how the hours split, usually after the fact and usually in the technician's favor by rounding. A punch per site removes the guesswork and gives each client an accurate number.

Setting up geofences without technicians fighting the system

A geofence that's drawn too tight around a client's building creates its own problem: a technician standing in the parking lot or the lobby can't clock in because the app says they're outside the boundary. Set the radius wide enough to cover the whole site, including parking, before rolling it out to the team, and test it from a technician's actual phone rather than trusting the address lookup to be accurate on the first try.

It's also worth deciding upfront how the firm handles a technician who genuinely can't get a GPS lock, a basement server room being the classic case, so there's a fallback that doesn't turn into a fight over whether the hours were real.

Use this sequence for a smooth geofence rollout:

  1. Draw each client geofence wide enough to cover the whole site, including the parking lot and lobby, so technicians aren't locked out of clocking in.
  2. Test the geofence from a technician's actual phone at the site before rolling it out to the whole team.
  3. Require a punch out and back in whenever a technician moves between client sites, instead of splitting one long shift by hand afterward.
  4. Confirm with the vendor how punches behave with weak signal, since server rooms and basements are where a missed sync is most likely.
  5. Explain the rollout as billing accuracy, since verified punches protect technicians as much as the firm when a client questions an invoice.

Rolling it out to technicians who already resent being tracked

Field technicians sometimes read a new geofenced clock-in as a sign of distrust, especially if the firm has never had this level of tracking before. The framing that tends to land better is billing accuracy, not surveillance: explaining that verified punches protect the technician just as much as the firm when a client questions an invoice, since the record shows exactly when work started and ended rather than leaving it to a client's recollection of when the technician arrived.

A short rollout period where technicians can see their own punch history and flag anything wrong, before it's tied to actual payroll, also helps build trust in the system before it starts affecting anyone's paycheck. Pairing that rollout with a plain explanation of how the geofence radius was set, and who to contact if a legitimate punch gets rejected, heads off most of the early complaints before they turn into a wider grievance that lands on the office manager's desk instead of getting resolved on the spot.

Executive Capability Standard

What Good Looks Like

Good time tracking for an IT consulting or MSP team means every billed hour is tied to the right client site, a technician's location can be verified if a client ever questions an invoice, and dispatch scheduling doesn't depend on one person's memory of who's free.

Building The Capability (5-Stage Skill Ladder)

1. Learn:Pull recent client invoices and check how often billed hours had to be estimated or reconstructed after the fact rather than recorded in real time.
2. Do Manually:Have technicians log their site visits and hours in a shared spreadsheet at the end of each day.
3. Delegate:Put a dispatcher or team lead in charge of the weekly site schedule and reviewing hours before they go to billing.
4. Automate:Move to a geofenced clock-in tool like Buddy Punch or a shift-scheduling tool like Deputy so hours and site assignments are captured as they happen.
5. Buy:Connect verified hours directly to client billing so invoices are built from recorded time rather than a technician's end-of-week recollection.

How to Get Started

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Frequently Asked Questions

Can we bill a client directly off the geofenced punch record?

The punch record itself isn't an invoice, but it's a defensible input into one. Export the verified hours per client site into whatever billing or invoicing tool the firm already uses rather than trying to make the time-tracking tool double as an invoicing system.

What if a technician's phone loses signal at a client site with poor cell coverage?

Most GPS-based apps cache the punch on the phone and sync it once a connection returns. Confirm this with the vendor if technicians regularly work in basements, server rooms or other weak-signal locations, since that is exactly where a missed sync matters most.

How do we handle a technician who's on call overnight for a managed-services contract?

Track on-call time separately from active work time, since they're usually paid differently, a flat on-call rate versus full hourly pay once actually working. Both tools can support separate shift types for this, but the firm has to configure that distinction rather than lumping everything into one hourly rate.

About the numbers

This guide doesn't quote a sourced benchmark. Figures in it are estimates or general guidance, so check them against your own numbers.

Related Guides