Hourly Workforce Time Tracking & Scheduling3 min readUpdated September 2026

Buddy Punch vs Deputy for Multi Office Dental Staff

Hygienists and assistants work across multiple offices in the same week, and each location keeps its own time record. Consolidating them for payroll is a manual exercise every period, usually involving a spreadsheet and someone in the central office chasing down numbers from three or four practice managers who each run their own version of the schedule.

The choice between Buddy Punch and Deputy for a dental support organization mostly comes down to how much that floating actually happens across your specific offices.

Vendors Covered in this Article

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

A worked example: one hygienist's week across two offices

Say a hygienist works Monday and Tuesday at the downtown office and Wednesday through Friday at the suburban location, which is a common pattern in a growing DSO covering staffing gaps across its network. On paper, this means two separate time records, two separate office managers entering hours, and one central payroll administrator manually combining them into a single paycheck. Any error in either individual record, a missed punch, a wrong time entered, now has to be caught by someone comparing two disconnected sources rather than one system that already knows this hygienist works across both locations.

What changes with a single multi office system

Deputy's multi location handling was built closer to this exact problem: one employee record that tracks hours across every authorized location, consolidated automatically rather than manually combined. The hygienist from the example above would show up as a single weekly total split correctly by office for cost allocation, without anyone in the central office doing the combining by hand. Buddy Punch can support multiple locations too, but its consolidation across locations is less built out, which matters more the more offices a single staff member actually floats between.

Where a single office DSO does not need the added complexity

A dental group where staff are dedicated to one office, with floating limited to occasional emergency coverage, does not have the consolidation problem this comparison is built around. In that case, Buddy Punch's simpler, per office setup is faster to deploy and easier for individual office managers to run day to day, since the harder multi location reporting that Deputy offers is not solving a problem this DSO actually has.

Getting the consolidated hours into payroll without a second reconciliation

Once hours consolidate correctly inside the time system, the value evaporates if payroll still requires a manual export and re-entry. Rippling can take a consolidated, multi office record and run payroll against it directly, applying the right pay rate by role without the central administrator rebuilding the hygienist's week in a spreadsheet, which is the step that used to take up most of a payroll day at a growing DSO.

What to check before rolling this out across every office

Before switching every office at once, pilot the consolidation with one or two staff members who are known to float regularly between locations, since they are the clearest test of whether the system is actually solving the problem. Confirm their combined weekly total matches what the old manual process would have produced before trusting the new system for the whole DSO, and give office managers a short training pass on how floating hours now show up in their own location's reporting so nobody is surprised when a shared staff member's hours appear differently than before.

Before rolling the change out across every office, check the following:

  • Pilot the consolidation with one or two staff members who float regularly between offices, since they are the clearest test of whether the system solves the problem.
  • Confirm each floating hygienist or assistant appears as a single record with combined weekly hours across every authorized office.
  • Check that consolidated hours reach payroll without a manual export and re-entry, for example with Rippling applying the right pay rate by role.
  • Document how floating staff should be recorded so a new practice manager does not quietly reintroduce the manual reconciliation.

A DSO specific pitfall: practice manager turnover disrupting the consolidation habit

Practice managers change roles more often than central administrators expect, and a new manager unfamiliar with how floating staff are supposed to be recorded can quietly reintroduce the exact manual reconciliation problem the system was meant to solve. Document the floating staff process clearly enough that a new office manager can follow it without training from the previous one, and check in on newly onboarded managers specifically during their first few pay periods rather than assuming the system alone will teach them the right habits.

How this changes the conversation with a hygienist about their own schedule

A consolidated record also gives an individual hygienist or assistant a single, accurate view of their own week across offices, rather than two partial pictures they have to mentally combine themselves. That clarity tends to reduce a specific kind of quiet dispute, a staff member who believes they worked more hours than they were paid for because they were only comparing their memory against one office's partial record rather than the true combined total, which the old two system setup made almost impossible to resolve cleanly. Giving staff that same combined view, rather than keeping it only in the central administrator's spreadsheet, tends to build trust in the payroll process generally, not just around floating hours specifically.

Executive Capability Standard

What Good Looks Like

Good multi office labor tracking in a DSO means a floating hygienist or assistant's hours consolidate into one accurate record across every office they worked, correctly split for cost allocation, without a manual combination step each pay period.

Building The Capability (5-Stage Skill Ladder)

1. Learn:Pull one recent pay period and count how many staff members' hours had to be manually combined from more than one office record.
2. Do Manually:Have office managers flag any staff floating to another location that week so central payroll knows to expect a combined record.
3. Delegate:Assign one central payroll administrator ownership of reviewing floating staff records for consolidation errors before each pay run.
4. Automate:Move all offices onto Buddy Punch or Deputy under a single employee record so hours consolidate automatically across locations.
5. Buy:For a DSO where floating between offices is routine, standardize on Deputy's multi location reporting connected directly to payroll.

How to Get Started

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Frequently Asked Questions

How common is it for hygienists and assistants to float between offices in a DSO?

Very common in growing DSOs, especially where offices are geographically close and staffing gaps get covered informally rather than through a formal transfer process. The more this floating happens, the more a multi office consolidated time system pays for itself compared with reconciling separate per office records manually.

Does average employee tenure matter for choosing a time tracking system?

It matters for how much training investment is worth making. Median tenure across the private sector workforce runs around 42 months, roughly three and a half years1, so staff who stick around that long will use a well configured system correctly for years, which favors investing in the setup that best fits your actual floating pattern rather than the fastest option to deploy.

Should a single location dental practice bother with either tool?

Yes, but the simpler one. A single office with a stable staff still benefits from accurate clock in and overtime alerts, just without needing the multi location consolidation that a DSO with floating staff requires. Buddy Punch's lighter setup is usually the better fit at that scale.

Sources

Where we quote a benchmark, we show its source. Other figures in this guide are estimates or general guidance, so check them against your own numbers.

  1. Median tenure with current employer (converted to months). BLS Employee Tenure in 2024 (CPS supplement, January 2024), 2024.

Related Guides