Hourly Workforce Time Tracking & Scheduling3 min readUpdated September 2026

Time Tracking for the Admin Staff Behind a Consulting Firm

A consulting firm's billable staff usually track time against client engagements, not against a payroll punch clock, since a partner or senior consultant is salaried and their hours matter for utilization, not wage law. The hourly employees who do need a real time-tracking tool are usually somewhere else entirely: office coordinators, research assistants, part-time administrative staff, the people who keep the firm running rather than bill directly to clients.

That's a narrower need than most industries this software gets pitched to, and it changes which features actually matter. Buddy Punch and Deputy both work here, but the deciding factor is usually how variable that admin team's hours are week to week.

Vendors Covered in this Article

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Separating billable time tracking from payroll time tracking

The first thing to get right is that a consulting firm almost certainly already has a time-tracking system, just not the kind this comparison is about. Consultants log billable hours against client codes for invoicing and utilization reporting, usually inside a practice-management or professional-services tool. Buddy Punch and Deputy solve a different problem: recording when an hourly, non-billable employee actually worked, for payroll purposes. Keeping those two systems mentally and operationally separate avoids a confusing rollout where staff aren't sure which tool tracks what.

Buddy Punch's fit for a small, steady admin team

If the firm's hourly staff work a fairly consistent schedule, such as a receptionist at the front desk or an office coordinator in five days a week, a straightforward time clock with location or photo verification may cover the need without much overhead. GPS or IP verification confirms the person was actually in the office, which matters if remote work policies are inconsistent across the firm, and the record is clean enough to hand to payroll without much reconciliation.

Deputy's fit if admin hours flex with client work

Some firms staff up temporary research or administrative support around a specific engagement, a data-heavy diligence project, a large proposal push, and that kind of variable staffing is where Deputy's shift-based model earns its keep. Building a short-term schedule for a research assistant brought on for six weeks, and letting them pick up or swap defined blocks of work, is a cleaner fit than trying to force a temporary engagement into a fixed weekly punch-clock pattern.

A mistake worth avoiding: tracking consultants' hours in the wrong system

Firms sometimes try to consolidate everything into one tool, including billable consultant hours, because it seems simpler than running two systems. This usually backfires. A time-tracking tool built for hourly payroll doesn't handle the reporting a billable-hours system needs, client codes, realization rates, write-offs, and forcing salaried consultants to punch a clock for a payroll purpose that doesn't apply to them creates confusion about why they're suddenly being asked to clock in and out.

What to check before rolling either tool out

Start by listing every hourly, non-exempt role at the firm and how steady each one's schedule actually is. A role that's the same five days a week points toward the simpler tool. A role that flexes with deal flow or project staffing points toward the shift-based one. It's a short exercise, but skipping it is how firms end up paying for scheduling features an office coordinator with a fixed schedule will never use.

Work through these steps before choosing a tool:

  1. List every hourly, non-exempt role at the firm and note how steady each role's schedule actually is from week to week.
  2. Point roles with the same schedule every week toward the simpler time clock, and roles that flex with deal flow toward the shift-based tool.
  3. For each role, ask whether the schedule ever needs to be built or adjusted, or only recorded, and let that answer decide the tool.
  4. Keep salaried consultants' billable hours in the practice-management system instead of forcing them onto a payroll punch clock.
  5. If the firm has several offices, check each location's pay rates and state overtime rules before running one setup everywhere.

What changes at a multi-office or multi-practice firm

A consulting firm with more than one office, or with distinct practice groups that each staff their own admin support, adds a coordination layer that a single-office firm doesn't have to think about. An office coordinator in one city and a research assistant in another may have completely different schedules, pay rates, and even applicable state overtime rules, and running both through one undifferentiated setup risks getting a state-specific rule wrong for one of them.

Set up the tool by location or practice group rather than as one flat roster, and confirm which state's wage and hour rules actually apply to each hourly employee based on where they physically work, not where the firm's headquarters happens to be.

A quick way to decide which tool fits without a long evaluation

Rather than running a full vendor evaluation for what's often a two- or three-person hourly team, ask one question about each role: does this person's schedule ever need to be built or adjusted, or does it just need to be recorded? A receptionist working the same hours every week just needs recording, which points toward the simpler tool. A research assistant staffed project by project needs both recording and active scheduling, which points toward the shift-based option.

That single question resolves most of the decision for a firm this size faster than comparing every feature on both vendors' pricing pages, and it keeps the rollout focused on the actual problem rather than the tool with the longer feature list.

Executive Capability Standard

What Good Looks Like

Good time tracking for a consulting firm's hourly admin staff means their hours are recorded accurately for payroll, that process stays clearly separate from billable consultant time tracking, and staffing for temporary or project-based admin support doesn't depend on a manager's memory.

Building The Capability (5-Stage Skill Ladder)

1. Learn:List every hourly, non-exempt role at the firm and check how each one's hours are currently being recorded.
2. Do Manually:Have hourly staff log hours in a shared spreadsheet that an office manager reviews before payroll.
3. Delegate:Put an office manager or operations lead in charge of approving hourly time and staffing any temporary admin support.
4. Automate:Move hourly staff onto a verified clock-in tool like Buddy Punch, or a shift-based one like Deputy if hours vary by engagement.
5. Buy:Connect that tool directly to payroll so hourly wages calculate automatically without a manual reconciliation step each pay period.

How to Get Started

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Frequently Asked Questions

Do billable consultants need to use Buddy Punch or Deputy at all?

Generally no. Salaried, exempt consultants track billable hours for client invoicing and utilization, which is a different system and a different purpose than an hourly payroll time clock. Mixing the two into one tool usually creates confusion rather than efficiency.

How do we handle a research assistant staffed temporarily on one engagement?

Treat it as a defined shift block with a clear start and end date rather than an open-ended weekly schedule. A shift-based tool like Deputy handles that kind of temporary, project-bound staffing more naturally than a straightforward punch-clock tool does.

What's the simplest setup for a firm with just two or three hourly admin staff?

A lightweight, verified clock-in tool that exports cleanly to payroll is usually enough. There's rarely a need for shift marketplaces or auto-scheduling when the hourly group is small and the schedule doesn't change much week to week.

About the numbers

This guide doesn't quote a sourced benchmark. Figures in it are estimates or general guidance, so check them against your own numbers.

Related Guides