Project & Operations Management3 min readUpdated September 2026

Asana vs Monday.com for Commercial Solar EPC Projects

A commercial solar or energy EPC project spends more calendar time waiting on outside approvals, permits, interconnection applications, utility inspections, than it spends with crews actually on site. The install itself might take days; the permitting and interconnection process around it can take months and involves parties who don't answer to your schedule.

That sequence, engineering and design, permitting, procurement, installation, commissioning, utility sign-off, is a real dependency chain, and the tool that models it as a chain rather than a flat task list tends to make the waiting periods visible instead of invisible.

Vendors Covered in this Article

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

The Project Is Mostly Waiting, Not Building

Between signed contract and permission to operate, a commercial solar project typically passes through engineering review, a permitting authority, an interconnection application to the utility, equipment procurement lead times, and a final utility inspection, each with its own queue that your team doesn't control. Crews only show up for a fraction of that timeline.

The operational risk isn't usually the install itself going wrong, it's a permit application sitting in a queue longer than expected without anyone noticing until the crew is scheduled and the permit still isn't in hand.

Modeling the Dependency Chain in Asana

Asana's task dependencies can model this sequence explicitly: the interconnection application can't be submitted until stamped engineering drawings are done, procurement can't be finalized until the design is locked, and installation can't be scheduled until the permit is in hand. That structure makes clear which specific external approval is actually the bottleneck on a given project at any moment.

Across a portfolio of projects at different stages, Asana's portfolio view can roll up which projects are stuck waiting on which type of approval, useful for spotting a pattern, several projects all stuck at the same permitting authority, that's worth addressing directly with that office rather than treating each delay as a one-off.

Tracking Procurement Lead Times in Monday.com

Monday.com's board automations suit equipment procurement tracking, where a column for expected delivery date against a project's installation target date can flag a mismatch early, before a crew is scheduled to show up for equipment that hasn't arrived. A board across all active projects also makes it easy to see which ones have equipment on order versus already on site.

Given how much commercial solar equipment involves long lead times on specific components, that early-warning view tends to prevent a scheduled crew showing up to a site with no equipment better than tracking procurement as a single undifferentiated task.

A Runbook From Signed Contract to Permission to Operate

A workable sequence: engineering completes stamped drawings, the permit application is submitted to the local authority, the interconnection application goes to the utility in parallel where that's allowed, procurement is finalized once design is locked, installation is scheduled once the permit is in hand and equipment has arrived, commissioning follows installation, and the utility's final inspection and permission to operate closes the project.

Track each of those as a distinct milestone with its own expected duration based on your own project history, not a generic industry estimate, since permitting timelines vary significantly by local authority and utility. Reviewing actual versus expected duration after each closed project, and updating the template with what you learned, is what makes those internal estimates meaningfully more accurate the next time around.

Where Crew Scheduling Fits

Once a permit and equipment are both confirmed, crew scheduling itself is a shorter, more typical project task: assign a crew, confirm a start date, sequence the install against weather and site access. The mistake to avoid is scheduling a crew based on an optimistic permit timeline rather than a confirmed one, which leads to either an idle crew or a rushed reshuffle when the permit doesn't land on time.

Build crew scheduling as a task that depends on the permit and procurement milestones actually closing, not on their target dates, so the schedule reflects reality rather than the original plan.

Avoid idle crews and stalled projects with these checks:

  • Schedule the crew against confirmed milestones, permit in hand and equipment on site, rather than target dates from the original plan.
  • Compare each project's expected equipment delivery date with its installation target date, and flag any mismatch before a crew is booked.
  • Model dependencies explicitly, so the interconnection application cannot be submitted until stamped engineering drawings are done.
  • Use a portfolio view by milestone, so you can see which specific approval is blocking each project.
  • Submit permit and interconnection applications through each authority's own process, and use the tool only to track their status.

Where ClickUp Adds Value for Smaller EPCs

ClickUp's combined docs and whiteboards can hold site assessment notes, single-line diagrams, and permit correspondence alongside the task tracking, useful for a smaller EPC where the same project manager handles design coordination and permitting correspondence directly. That consolidation matters less for a larger EPC with separate engineering, permitting, and construction teams, where keeping documents and tasks in purpose-built systems for each function often works better, since a permitting specialist and a construction superintendent tend to need different views of the same underlying project.

Executive Capability Standard

What Good Looks Like

Good project and operations management for a commercial solar or energy EPC means every project's dependency chain, engineering, permitting, interconnection, procurement, installation, commissioning, is visible with a clear bottleneck at any given moment, and a crew is never scheduled ahead of a confirmed permit.

Building The Capability (5-Stage Skill Ladder)

1. Learn:Map your last several projects' actual timelines from contract to permission to operate and identify where delays actually happened.
2. Do Manually:Track each project's milestone status on a shared spreadsheet with target and actual dates before adding dedicated software.
3. Delegate:Assign a project coordinator responsible for following up on stalled permits and interconnection applications across all active projects.
4. Automate:Set up Asana or Monday.com with dependency chains so crew scheduling can't proceed ahead of a confirmed permit and equipment delivery.
5. Buy:Add solar-specific project management software once portfolio size outgrows what a general dependency-based tool can track cleanly.

How to Get Started

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Frequently Asked Questions

Can either tool submit permit or interconnection applications for us?

No, both are project tracking tools, not permitting or utility application platforms. You still submit applications through each authority's own process. The tool's job is tracking the application's status and flagging how long it's been sitting without a response.

How early should we schedule the installation crew?

Schedule the crew against confirmed milestones, permit in hand and equipment on site, rather than target dates from the original plan. Scheduling too early based on an optimistic permit timeline is one of the more common ways a crew ends up idle or a project gets rushed.

What's the biggest risk in tracking multiple projects at different permitting stages?

Losing sight of which specific approval is actually blocking each project. Without a portfolio view showing status by milestone, it's easy to assume a project is progressing normally when it's actually been sitting in the same permitting queue for weeks without anyone following up.

About the numbers

This guide doesn't quote a sourced benchmark. Figures in it are estimates or general guidance, so check them against your own numbers.