Project & Operations Management3 min readUpdated September 2026

Asana vs Monday.com for Outpatient Physical Therapy Networks

An outpatient physical therapy network's daily operational pressure isn't any single patient visit, it's keeping therapist caseloads balanced across clinics while insurance authorizations for ongoing treatment plans get renewed before they lapse mid-course. A therapist out sick at one clinic and an authorization expiring at another can both happen the same week, and neither shows up clearly if the tracking is scattered across each clinic's own informal system.

Asana and Monday.com don't touch documentation or billing, your EHR and clearinghouse handle that. Where they add real value is staffing visibility across clinics and authorization tracking that catches a lapse before a scheduled visit gets denied.

Vendors Covered in this Article

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Caseload Visibility Across Clinics, Not Just One

A single clinic's front desk usually has a good feel for that clinic's therapist availability. A network spanning several clinics loses that instinctive visibility, which becomes a real problem when a therapist calls in sick and a nearby clinic has capacity to help but no one realizes it in time to redirect patients.

Building a shared view of therapist availability and caseload across every clinic, not just within one, is what turns an ad hoc phone-tree scramble into an actual staffing decision made with full information.

How do you track staffing gaps across clinics in Monday.com?

Monday.com's board view suits a network-wide staffing view, with a row per clinic showing today's therapist coverage against expected patient volume, and a status flag when a clinic is short-staffed. A clinical director overseeing several locations can scan that board each morning rather than calling each clinic manager individually to check.

Automations can also flag a clinic that's been consistently understaffed over several weeks, which is a hiring signal worth surfacing before it shows up as declining patient satisfaction or increased no-shows from long wait times.

How do you track authorization renewals in Asana?

Asana's custom fields can hold each active patient's authorization expiration date and visit count remaining as a standing tracked list, with a filtered view showing authorizations expiring soon. That matters because a lapsed authorization discovered at check-in means either an awkward conversation with the patient about a self-pay visit or a canceled appointment, both avoidable with earlier visibility.

This is one area where the tracking discipline pays for itself directly: a caught-in-time authorization renewal keeps a treatment plan on schedule, while a missed one can mean a gap in care that sets a patient's recovery back.

A Checklist for the Weekly Network Review

A useful weekly review for a network's clinical operations lead covers a short, specific list:

  • Which clinics are understaffed relative to scheduled patient volume this week
  • Which patients have authorizations expiring within the next two weeks
  • Which therapists are approaching a caseload that's too heavy to sustain quality of care
  • Which clinic has had the most last-minute cancellations, since that often signals a scheduling or staffing problem worth investigating

Running this as a short, repeatable review, rather than an open-ended check of everything, keeps it something a busy clinical director will actually do every week instead of skipping when things get hectic. Fifteen focused minutes on these four questions catches more real problems than an hour spent scrolling through every clinic's full task list looking for something that stands out.

Where the Common Pitfall Shows Up

The most common failure isn't a therapist forgetting to document a visit, it's an authorization renewal request submitted too close to the expiration date, leaving no buffer if the insurer's review takes longer than expected. Build the renewal request task to trigger well before the authorization actually expires, based on your own experience of how long insurer turnaround typically takes, not the authorization's stated expiration date itself. Reviewing your last several renewal turnaround times is the fastest way to set a trigger date grounded in reality instead of an optimistic guess.

What Stays in the EHR

Clinical documentation, treatment notes, and the actual authorization submission process stay in your EHR and billing clearinghouse. Asana or Monday.com should track the operational visibility around that work, staffing balance and renewal deadlines, not attempt to hold clinical records or submit claims directly.

The test worth applying when a new tracking need comes up is the same one that works across most clinical operations: does this belong to a specific patient's care, or to running the network. A patient's plan of care and progress notes belong in the EHR. A clinic's staffing level or a renewal deadline belongs in the operational tool. Keeping that boundary clear keeps both systems doing the job they're actually good at.

Executive Capability Standard

What Good Looks Like

Good project and operations management for a PT network means therapist staffing gaps are visible across every clinic, not just the one experiencing them, and every patient's authorization is renewed with enough buffer that a lapse never interrupts a scheduled visit.

Building The Capability (5-Stage Skill Ladder)

1. Learn:Review your last quarter's authorization lapses and staffing gaps to see where the current informal tracking actually broke down.
2. Do Manually:Run a weekly staffing and authorization review from a shared spreadsheet across all clinics before adding dedicated software.
3. Delegate:Assign a clinical operations lead responsible for the network-wide staffing view and authorization renewal tracking.
4. Automate:Set up Monday.com with a network staffing board and Asana with authorization expiration alerts set well ahead of the actual deadline.
5. Buy:Add authorization management software with payer integrations once patient volume outgrows manual tracking of renewal deadlines.

How to Get Started

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Frequently Asked Questions

Can either tool submit insurance authorization requests for us?

No, authorization requests still go through your clearinghouse or the payer's own portal. The project tool's role is tracking the deadline and flagging when a renewal needs to be started, not handling the submission itself.

How far in advance should we start an authorization renewal?

Base it on your own payers' typical turnaround time rather than a generic rule, since it varies by insurer. Track how long your last several renewals actually took and set your trigger date with enough buffer to cover the slower end of that range.

Should therapists see staffing data for clinics they don't work at?

Most networks limit therapist visibility to their own clinic's schedule, while clinical directors and staffing coordinators see the full network view. A therapist generally doesn't need another clinic's caseload data to do their own job well.

About the numbers

This guide doesn't quote a sourced benchmark. Figures in it are estimates or general guidance, so check them against your own numbers.

Related Guides