Asana vs Monday.com for Strategy Consulting Engagements
Q: Does a strategy consulting engagement even need project software, isn't it mostly people thinking and writing decks?
A: The thinking happens off any tool, but a multi-workstream engagement with a steering committee expecting a status update every two weeks still needs somewhere the team tracks who owns which hypothesis, what's due before the next committee meeting, and which deliverable is actually client-ready. That's the part Asana and Monday.com can help with, and here's where they diverge.
Vendors Covered in this Article
Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.
How do the two handle a workstream structure?
A typical engagement splits into two to four workstreams, each with its own lead, hypotheses to test, and deliverables feeding a final synthesis. Asana's projects-within-a-portfolio model maps naturally onto this: one workstream per project, rolled into a portfolio the engagement manager watches for overall status. Monday.com can mirror the same structure with one board per workstream and a dashboard pulling status across all of them. The practical difference shows up in how each workstream lead actually works day to day: Asana's task-and-subtask model suits teams thinking in discrete research questions, while Monday.com's columns suit teams that want to eyeball where every workstream stands in one visual sweep without opening each one.
What about the steering committee cadence?
Every engagement has a recurring checkpoint, weekly or biweekly, where the client sponsor needs a clean view of progress without wading through internal task noise. Monday.com's shareable board can expose exactly the status-and-milestone view a steering committee wants, updated live instead of rebuilt into a deck the night before. Asana's guest access at the portfolio or project level does something similar, though a consulting team that still wants to control precisely what a client sees in the moment before a meeting will often screenshot the current state into the actual deck anyway. Neither tool eliminates deck-building for a client-facing readout; both can at least make sure the underlying status they're reporting from is current, not reconstructed from memory.
How do you track deliverables that are, essentially, documents?
A consulting deliverable is usually a slide or a memo, not a task with a clear done state, which makes typical task-tracking awkward until you treat draft, internal review, and client-ready as the actual statuses, rather than just open and closed. Asana's custom status fields can model that review chain explicitly, with a rule notifying the engagement manager when something hits client-ready. Monday.com's status columns do the same with color-coded stages that are easy to scan across a whole workstream at once. Either way, the deliverable itself, the actual deck or memo, lives in a separate document or file tool; the project tool is tracking its state, not authoring it.
Does either tool help manage the client relationship itself?
Not directly, and that's worth being honest about. Stakeholder mapping, sponsor politics, and reading the room in a steering committee meeting are judgment calls no board or column handles. What the tools can do is keep the operational side, who owes what by when, from becoming a distraction during those meetings, so the actual relationship management gets the attention it needs instead of getting derailed by someone asking where a deliverable stands. Dedicating a person to full-time program coordination is a real cost on a small engagement team, and it's worth weighing against spreading that responsibility across workstream leads instead, at least until the firm is running enough concurrent engagements to justify a dedicated role.
What's the honest limitation of either tool here?
Neither Asana nor Monday.com understands hypothesis-driven work the way a consulting-specific methodology tool might; both are general project trackers adapted to fit. That adaptation works fine for the operational layer, deadlines, ownership, review status, but don't expect either to help structure the actual analytical approach of an engagement. Firms that try to force their whole methodology into custom fields and dependencies usually end up with an overbuilt board nobody wants to maintain. Keep the tool doing what it's good at: visible ownership and deadlines, and let the thinking happen in documents and conversations it was never meant to replace.
Q: What's the most common way firms mess up the setup?
A: Building the board around the org chart instead of the engagement's actual workstreams. A partner-led structure feels natural because it mirrors how the firm is organized internally, but it hides the thing a client-facing status update actually needs to show, which hypothesis has evidence and which doesn't yet. Structure the board around the workstreams themselves, research question by research question, with people assigned to each, rather than one section per partner with everyone's mixed work dumped inside it. Firms that make this switch usually find their steering committee updates get faster to prepare, not slower, because the status finally maps to what the client is actually asking about.
Q: How much should we customize before the first engagement using it?
A: Less than feels comfortable. The instinct on a new tool is to build every field and automation you might eventually want before running a single real engagement through it, and that instinct almost always produces an overbuilt template nobody on the team actually understands well enough to use correctly under deadline pressure. Build the minimum: workstream structure, a deliverable status chain, and a client-visible summary view. Run one real engagement through it, then refine based on what that engagement actually needed, not what seemed useful in the abstract during setup week.
A minimal setup for the first engagement:
- Model each deliverable's review chain with statuses for draft, internal review and client-ready, rather than just open and closed.
- Add a rule that notifies the engagement manager when a deliverable reaches internal review.
- Structure the board around the engagement's workstreams instead of the firm's org chart, so status shows which hypothesis has evidence.
- Expose a steering committee view of status and milestones, kept live, without internal task noise.
- Start with the minimum template, adding fields only after a real engagement shows they are needed.
What Good Looks Like
A well-run engagement can show any workstream's status, what's blocking the next steering committee update, and which deliverables are actually client-ready, without anyone having to chase a workstream lead for an answer.
Building The Capability (5-Stage Skill Ladder)
How to Get Started
Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.
Portfolios and custom status fields suit engagement teams that think in workstreams with a clear draft-to-client-ready review chain.
Shareable boards and color-coded status columns give a steering committee a fast visual read on progress without a rebuilt deck.
Nested spaces can model a multi-workstream engagement with its own hierarchy for firms that want that structure built in from the start.
Frequently Asked Questions
Which tool is better for a small strategy boutique versus a larger consultancy?
A small boutique running two or three engagements at once can usually get by with either tool's default templates and light customization. A larger consultancy running many concurrent engagements benefits more from Asana's portfolio rollups or Monday.com's cross-board dashboards, since the coordination overhead of tracking many workstreams by hand grows fast once you're past a handful of live engagements.
Can we use either tool to build the actual client deliverables?
No, not for the decks and memos themselves. Both are task and status trackers, not document editors. Attach the actual deliverable as a file or a link to wherever it lives, and use the project tool to track its review stage, draft, internal review, or client-ready, rather than trying to author the content inside it.
How should we handle a steering committee's view versus the internal team's view?
Build a separate, curated view for the client, a shareable board or a guest-scoped project showing only milestones and status, and keep the internal working detail, task-level debate, early drafts, in a project the client never sees. That split protects the team's ability to work messily internally while still giving the sponsor a clean, confident view of progress.
About the numbers
This guide doesn't quote a sourced benchmark. Figures in it are estimates or general guidance, so check them against your own numbers.
Related Guides
Three Criteria for Choosing a Strategy Consultancy's Contract Tool
Three practical criteria, deal volume, conflict complexity, and confidentiality exposure, for deciding between PandaDoc and Ironclad at a consulting firm.
Rippling vs Firstbase When Consultants Live on Client Sites
For management consulting firms: how Rippling and Firstbase compare when staff rotate between client engagements every few months.
Justworks vs Rippling by Seniority Band at a Strategy Firm
How to weigh Justworks against Rippling for a management or strategy consulting firm, broken down by associate, manager, and partner staffing needs.
Rippling vs Gusto for a Consulting Firm's Bonus Season
Partner draws, project bonuses, and travel reimbursements make a consulting firm's payroll harder than headcount alone suggests. Here's the comparison.
The Engagement Kickoff Checklist Most Consultancies Skip
A rushed engagement kickoff is where consulting firms inherit conflicts and scope gaps they don't discover until the deliverable review. Here's the fix.
Make vs Zapier for Running a Multi-Client Consulting Practice
See how Make and Zapier compare for a strategy or management consulting practice managing proposals, engagement tracking and retainer billing across clients.