Asana vs Monday.com for Commercial General Contractors

A general contractor's office staff isn't managing one project, they're managing the paper trail behind several jobsites at once: submittals waiting on architect approval, RFIs waiting on an engineer's answer, and change orders waiting on an owner's signature, each with its own deadline and its own consequence for the schedule if it slips.

Neither Asana nor Monday.com is built specifically for construction. The question worth asking is which one's general structure holds up best against that particular kind of paperwork-with-deadlines workload across multiple active sites.

Vendors Covered in this Article

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

The Paper Trail Is the Project

On a commercial job, the actual construction often isn't what threatens the schedule, an unanswered RFI or a submittal sitting on someone's desk is. Every one of those items has an owner outside your company, an architect, an engineer, an inspector, which means the tracking has to survive someone else's slow response without losing the thread.

A good system here isn't really project management in the creative-work sense, it's a log with deadlines and clear ownership, applied consistently across every active jobsite.

Tracking Submittals and RFIs in Asana

Asana's task dependencies can model the real sequence: a submittal can't close until the architect responds, and downstream framing work can't start until the submittal closes. That dependency chain makes it visible when an unanswered submittal is actually the thing blocking the schedule, not just an open item on a list.

Across multiple jobsites, Asana's portfolio view rolls up open submittals and RFIs by project, so a PM overseeing several jobs can see which site has the most open items without visiting each project separately.

Managing Change Orders on Monday.com

Monday.com's board automations suit change order tracking specifically: a status column that moves from drafted to submitted to owner-approved to executed, with an automation that flags anything sitting in "submitted" past a set number of days. That visibility matters because an unsigned change order is unbilled work, and unbilled work is cash the contractor is financing out of pocket.

For a contractor running many small change orders across several jobs, a board grouped by project with a change order status column tends to surface a stuck approval faster than a flat task list would.

A Checklist for Comparing the Two on Your Next Bid Cycle

Before you commit either way, run your current process against a short checklist:

  • Can it show, at a glance, every submittal or RFI blocking work on a specific jobsite this week
  • Can it flag a change order that's been sitting unapproved past your internal threshold
  • Can a superintendent update status from a phone on the jobsite without a full desktop session
  • Does the portfolio or dashboard view roll up open items across every active job, not just one
  • Can subcontractors get limited visibility into their own scope without seeing your internal cost data

A gap on the phone-update item is worth weighing heavily on its own, since jobsite staff rarely sit at a desk to check a dashboard.

Where the Common Pitfall Shows Up

The most common mistake isn't picking the wrong tool, it's tracking submittals and RFIs in the software while change orders stay in a separate email chain with the owner's rep, because change orders feel like a contracts function rather than a scheduling one. That split is exactly how an approved change order gets built without ever being billed. Keep both in the same system, even if different people own each.

What a Monday Ops Meeting Should Actually Review

For a contractor running several jobsites, the weekly office meeting works better as a review of exceptions than a status report on everything. Pull up only what's overdue: submittals past the architect's typical response window, RFIs with no answer, change orders sitting in "submitted" too long, and let the portfolio or dashboard view do the filtering instead of a PM narrating every job from memory.

That structure also makes the meeting shorter and more useful for a superintendent who's really there to flag a jobsite issue that needs office support, not to sit through a recap of jobs that are on track. If your current meeting spends more time on jobs that are fine than jobs that aren't, the tracking system isn't surfacing exceptions well enough yet.

The same exceptions-first approach works for a single PM overseeing several smaller jobs alone, without a full weekly meeting. A daily five-minute scan of what's overdue across every active project catches a stalled RFI faster than waiting for a scheduled review, and it's a habit either tool's portfolio view is built to support.

Executive Capability Standard

What Good Looks Like

Good project and operations management for a general contractor means every open submittal, RFI, and change order across every active jobsite is visible with a clear owner and deadline, and nothing sits unresolved long enough to threaten the schedule or go unbilled.

Building The Capability (5-Stage Skill Ladder)

1. Learn:Audit your current open submittals, RFIs, and change orders across all active jobs and note how many are past their expected response date.
2. Do Manually:Run submittal and RFI logs from a shared spreadsheet per job before moving to dedicated software.
3. Delegate:Assign a project engineer or coordinator responsible for keeping the log current and chasing overdue items.
4. Automate:Set up Asana or Monday.com with dependency chains and aging alerts so overdue items surface without manual checking.
5. Buy:Add construction-specific project management software once volume across many concurrent jobs outgrows a general task tool.

How to Get Started

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Frequently Asked Questions

Can either tool replace our estimating or takeoff software?

No. Estimating and takeoff are specialized functions with their own tools built for quantity surveys and bid pricing. Asana and Monday.com pick up after the bid is won, to manage submittals, RFIs, change orders, and the schedule of the actual build.

How do we handle subcontractors who won't use our project tool?

Most subs won't adopt your internal software, and that's fine. Keep the submittal or RFI item in your system as the record of truth, and communicate the actual request to the sub by whatever channel they'll respond to, email, phone, or a portal, then log their response back into the task.

Is a spreadsheet good enough for a single active jobsite?

For one job with a small team, a well-maintained spreadsheet can work, particularly for tracking submittal status. It tends to break down once you're running two or more jobs at once, since there's no single view across sites and no automatic flag when something's been sitting too long.